BDX-9008/31048386: Announcement of an amendment A15 Maasvlakte - Vaanplein (MaVa)
Rijkswaterstaat Grote Projecten en Onderhoud announces an amendment for the A15 Maasvlakte – Vaanplein (MaVa) project. The assignment concerns the renovation of seven tunnels within the Project Tunnelrenovaties Zuid-Holland (PTZ), specifically the Thomassen- and Botlektunnel. During the exploratory phase, two options are being investigated: option A maintains the current operation, monitoring, and control system (3BT) until the end date (2025, optionally until 2027), while option B requires a full renovation by the contractor within the term, to be realized by 2028. The procurement follows a negotiated procedure without publication. It is important that the contractor has experience with tunnel maintenance and 3BT systems and can meet the safety and performance requirements of Rijkswaterstaat.
Works · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
Rijkswaterstaat Grote Projecten en Onderhoud announces an amendment for the A15 Maasvlakte – Vaanplein (MaVa) project. The assignment concerns the renovation of seven tunnels within the Project Tunnelrenovaties Zuid-Holland (PTZ), specifically the Thomassen- and Botlektunnel. During the exploratory phase, two options are being investigated: option A maintains the current operation, monitoring, and control system (3BT) until the end date (2025, optionally until 2027), while option B requires a full renovation by the contractor within the term, to be realized by 2028. The procurement follows a negotiated procedure without publication. It is important that the contractor has experience with tunnel maintenance and 3BT systems and can meet the safety and performance requirements of Rijkswaterstaat.
Original: DBFM MAVA # VTW: For the purpose of the Project Tunnelrenovaties Zuid-Holland (PTZ), 7 tunnels must be renovated in terms of operation, monitoring, and control (3BT), including the Thomassen- and Botlektunnel. During the exploratory phase, two options are being investigated regarding the Thomassen- and Botlektunnel: # A: Maintaining the current operation and control system for a longer period until the End Date (current term is until 2025, with optional extensions until 2027). # B: Renovation by the Contractor within the term, before 2028.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of this amendment for the A15 Maasvlakte - Vaanplein?
Which options are being investigated in the exploratory phase for the Thomassen- and Botlektunnel?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159