ClosedWorksEuropeanOnderhandeling zonder bekendmaking

BDX-9008/31048386: Announcement of a modification A15 Maasvlakte - Vaanplein (MaVa)

Rijkswaterstaat Grote Projecten en Onderhoud · Onderhandeling zonder bekendmaking · 301907
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat Grote Projecten en Onderhoud announces a modification for the A15 Maasvlakte – Vaanplein (MaVa) project. The assignment concerns the adjustment of the UKVC Noodstop Botlekbrug in two phases. In the first phase, a preparatory phase will be carried out, including assistance from the Civiele Ingenieurs (CIV) for the temporary, routable emergency stop (VTW-9335-1). The second phase focuses on an impact analysis to determine the scope for the design of a permanent, routable emergency stop (VTW-9335-1). The procedure is a negotiated procedure without prior publication, meaning the tender is not publicly advertised. The assignment requires precise coordination with Rijkswaterstaat, compliance with safety and construction regulations, and the delivery of a detailed scope for the permanent design within the specified timeframe.

Works · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderRijkswaterstaatA15 MaasvlakteNoodstop Botlekbrug

01What is being requested

Rijkswaterstaat Grote Projecten en Onderhoud announces a modification for the A15 Maasvlakte – Vaanplein (MaVa) project. The assignment concerns the adjustment of the UKVC Noodstop Botlekbrug in two phases. In the first phase, a preparatory phase will be carried out, including assistance from the Civiele Ingenieurs (CIV) for the temporary, routable emergency stop (VTW-9335-1). The second phase focuses on an impact analysis to determine the scope for the design of a permanent, routable emergency stop (VTW-9335-1). The procedure is a negotiated procedure without prior publication, meaning the tender is not publicly advertised. The assignment requires precise coordination with Rijkswaterstaat, compliance with safety and construction regulations, and the delivery of a detailed scope for the permanent design within the specified timeframe.

Adjustment UKVC Noodstop Botlekbrug, consisting of 2 phases: 1. Preparatory phase plus assistance from the CIV for the purpose of the temporary routable emergency stop (VTW-9335-1) 2. Impact analysis for the purpose of determining the scope for the design of the permanent routable emergency stop (VTW-9335-1).

Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1A-LANES A15 B.V. potentialSME40
2Vialis B.V. potentialSME36
3Coentunnel Company BV potentialSME35
4Martens & Van Oord Aannemingsbedrijf b.v. potentialSME35
5Boskalis Nederland B.V. potentialSME35
6OpenIJ B.V. zijnde BAM PPP PGGM Infrastructure Coöperatie U.A./DIF Infra 3 Finance B.V./Participatiemaatschappij VolkerInfra PPP B.V. potentialSME35

05Legal themes that may be relevant here

06Frequently asked questions

What does the adjustment of the UKVC Noodstop Botlekbrug entail?
The assignment concerns the adjustment of the UKVC Noodstop Botlekbrug, divided into two phases: a preparatory phase with assistance from the Civiele Ingenieurs (CIV) for the temporary, routable emergency stop (VTW-9335-1) and an impact analysis to determine the scope for the design of a permanent, routable emergency stop (VTW-9335-1).
What is the division of the works in this project?
The works consist of two phases. Phase 1 includes the preparatory phase and assistance from the CIV for the purpose of the temporary routable emergency stop (VTW-9335-1). Phase 2 concerns the execution of an impact analysis to determine the scope for the design of the permanent routable emergency stop (VTW-9335-1).

Automatically compiled from the official tender data and documents.