Dredging waterway sections T2-T9 - DOS-2024-0001436
The Province of Zuid-Holland has maintained 10 waterway sections with a total length of 143 km. In this tender (DOS-2[telefoonnummer verwijderd]), mandatory dredging for sections T2-T9 is established. Goal: achieving the desired profile, limiting nuisance, and working sustainably.
Works · Restricted · European procedure
01What is being requested
The Province of Zuid-Holland has maintained 10 waterway sections with a total length of 143 km. In this tender (DOS-2[telefoonnummer verwijderd]), mandatory dredging for sections T2-T9 is established. Goal: achieving the desired profile, limiting nuisance, and working sustainably.
The Province of Zuid-Holland manages 10 waterway sections with a total length of 143 km. As the manager, it must ensure that the waterways remain available for shipping, including both commercial and recreational shipping. To keep the waterways available, they must have sufficient depth. This depth is achieved by dredging the waterways.n/nThe objective of this project is to achieve the desired profile on waterway sections 2 through 9, as established in the 'uitvoeringsregeling vaarwegprofielen Zuid-Holland 2015'. Waterway sections T1 and T10 will be executed in a separate project.n/nWith this
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the purpose of the dredging works on the waterway sections?
Which waterway sections are covered in this assignment?
What are the three main objectives of the execution?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159