ClosedWorksMarktconsultatie

AT-2023-02: Replacement and Renovation of Operation and Control of Maas Objects (MB 2.0) - Second market consultation

Rijkswaterstaat Programma's, Projecten en Onderhoud · Marktconsultatie · 1 lots · 324386
Type
Works
45350000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat is conducting a second market consultation for the project ‘Replacement and Renovation of Operation and Control of Maas Objects (MB 2.0)’. The objective is to renew the electrotechnical, mechanical engineering, and industrial automation installations in locks, bridges, weirs, pumping stations, and other water regulation works in the Maas and associated canals, in order to maintain the reliability and daily functioning of the assets in the Maas. The assignment is divided into a 2-phase approach; phase 1 focuses on analysis and planning, phase 2 on execution and delivery. The consultation asks market parties for input regarding feasibility, risk and cost management, and to increase market interest for the VenR section. The meeting will take place on 28 February 2024 and is intended to revise the procurement strategy, incorporate experiences from the first consultation, and involve the market in shaping the approach.

Works · Marktconsultatie · National procedure

Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksMaasOperationControl

01What is being requested

Rijkswaterstaat is conducting a second market consultation for the project ‘Replacement and Renovation of Operation and Control of Maas Objects (MB 2.0)’. The objective is to renew the electrotechnical, mechanical engineering, and industrial automation installations in locks, bridges, weirs, pumping stations, and other water regulation works in the Maas and associated canals, in order to maintain the reliability and daily functioning of the assets in the Maas. The assignment is divided into a 2-phase approach; phase 1 focuses on analysis and planning, phase 2 on execution and delivery. The consultation asks market parties for input regarding feasibility, risk and cost management, and to increase market interest for the VenR section. The meeting will take place on 28 February 2024 and is intended to revise the procurement strategy, incorporate experiences from the first consultation, and involve the market in shaping the approach.

Most electrotechnical and mechanical engineering installations in locks, movable bridges, weirs, pumping stations, and other water regulation works in the Maas and associated canals are approaching the end of their service life. This also applies to the IA/ICT systems for operation, which partly takes place remotely from the Bediencentrale Maasbracht. Consequently, the sensitivity to malfunctions and the risk of disruption are increasing.

45350000Works
1AT-2023-02: Replacement and Renovation of Operation and Control of Maas Objects (MB 2.0) - Second market consultation

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9092×
2Combinatie Heijmans - SWARCOUnknown9075×
3Heijmans Infra B.V.SME9067×
4ENGIE Infra & Mobility B.V.SME9069×
5BAM Infra B.V.SME8977×
6Boskalis Nederland B.V.SME8869×

04Legal themes that may be relevant here

05Frequently asked questions

What is the goal of the MB 2.0 project?
The goal is to ensure the daily functioning and performance of the assets in the Maas of the Zuid-Nederland service. This specifically focuses on the aspects of Electrotechnics and Mechanical Engineering (E&W) and Industrial Automation (IA) through the replacement and renovation of installations in locks, bridges, weirs, and pumping stations.
How is the approach to the assignment structured?
The assignment is carried out using a staggered 2-phase approach. Phase 1 focuses on analysis and planning, while phase 2 is focused on the execution and final delivery of the works.
What is the purpose of the second market consultation?
Through this consultation, Rijkswaterstaat aims to recalibrate the procurement strategy, inform the market about the new setup, and request input regarding the manufacturability, feasibility, and risk management of the extensive replacement and renovation of the Maas objects.
How can an organization participate in the market consultation session on 28 February 2024?
Interested parties can register via TenderNed (messages) before 21 February. When registering, the name, email address, organization, and job title must be provided. A preference is for a maximum of two participants per organization.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159