Arendsdorp-Waalsdorp phase 2 - Ridderlaan e.o. sewer replacement
The Municipality of Den Haag has a non-public tender for the replacement of approximately 1,000 m of sewer in the Arendsdorp-Waalsdorp phase 2 – Ridderlaan e.o. area in the Haagse Hout district. The project includes traditional replacement or renovation of the existing sewer, including civil engineering works such as the removal and reinstallation of foundation layers, kerbing, sewerage, house and gully connections, street furniture, and greenery. Additionally, traffic measures and various earthworks are required. The assignment focuses on a complete infrastructure improvement within an urban area, with safety, minimal traffic disruption, and sustainability as central themes. The municipality expects an integrated approach in which the contractor manages both the technical and logistical aspects, including the preparation of a detailed work plan, ensuring the quality of materials, and complying with applicable regulations.
Works · Restricted · National procedure
01What is being requested
The Municipality of Den Haag has a non-public tender for the replacement of approximately 1,000 m of sewer in the Arendsdorp-Waalsdorp phase 2 – Ridderlaan e.o. area in the Haagse Hout district. The project includes traditional replacement or renovation of the existing sewer, including civil engineering works such as the removal and reinstallation of foundation layers, kerbing, sewerage, house and gully connections, street furniture, and greenery. Additionally, traffic measures and various earthworks are required. The assignment focuses on a complete infrastructure improvement within an urban area, with safety, minimal traffic disruption, and sustainability as central themes. The municipality expects an integrated approach in which the contractor manages both the technical and logistical aspects, including the preparation of a detailed work plan, ensuring the quality of materials, and complying with applicable regulations.
This project concerns the sewer replacement for Arendsdorp-Waalsdorp phase 2 - Ridderlaan e.o. in the Haagse Hout district. The existing sewer will be replaced or renovated using traditional methods. The extent of the sewer to be replaced is approximately 1,000 m. The civil engineering actions required fall within the scope of the tender and mainly consist of: - Breaking up and installing paving elements; - Breaking up and installing foundation layers; - Breaking up and installing kerbing; - Breaking up and installing sewerage; - Removing and installing house and gully connections; - Rem
02Outcome
BAM Infra B.V.
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the extent of the sewer replacement in this project?
Which civil engineering works are part of the assignment?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159