Architect selection for the new construction of an all-in-one school including approx. 55 social rental apartments in Amsterdam
The assignment concerns the full architectural and building design works for a new construction project in Amsterdam: an all-in-one school with primary education, gym, and daycare, including approximately 55 social rental apartments. A design team must prepare a Sketch Design (SO) and subsequently deliver the Final Design (DO) including technical descriptions and the application for the environmental permit. The school comprises 2,255 m² of primary education (with 350 m² of outdoor play area), 552 m² gym, and 500-700 m² daycare (with 300 m² of outdoor space). The architect must take into account the requirements for safety, accessibility, energy performance, and the integration of the social rental apartments into the building. The assignment is non-public and falls under the service category.
Services · Restricted · European procedure
01What is being requested
The assignment concerns the full architectural and building design works for a new construction project in Amsterdam: an all-in-one school with primary education, gym, and daycare, including approximately 55 social rental apartments. A design team must prepare a Sketch Design (SO) and subsequently deliver the Final Design (DO) including technical descriptions and the application for the environmental permit. The school comprises 2,255 m² of primary education (with 350 m² of outdoor play area), 552 m² gym, and 500-700 m² daycare (with 300 m² of outdoor space). The architect must take into account the requirements for safety, accessibility, energy performance, and the integration of the social rental apartments into the building. The assignment is non-public and falls under the service category.
The assignment for the architect mainly involves the elaboration within a design team of a Sketch Design (SO) through to a Final Design, including technical descriptions and the application for an environmental permit for the new construction of the all-in-one school including approx. 55 social rental apartments, whereby architectural and building design works must be carried out. [newline][newline]The program of the all-in-one school consists of the following components:[newline]-[newline]Primary education 2,255 m² incl. outdoor play area lower school 350 m², separable and adjacent to the bu
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the size of the school building in this assignment?
What design works are expected from the architect team?
What is the nature of the new construction in Amsterdam?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713