Architect (incl. structural engineer) for the new construction of a school building, childcare, gym, and outdoor space design KC de Scheg
This assignment concerns the selection of an architect and structural engineer for the new construction of a child centre in the municipality of Aalsmeer.
Services · Restricted · European procedure
01What is being requested
The contract concerns a combination of an architect and structural engineer for the new construction of a school building, childcare, gym, and the design of the outdoor space of KC de Scheg with a duration of 36 months.
the contracting of a combination of an architect and structural engineer for a child centre to be newly constructed in the municipality of Aalsmeer.
02Strategic insight
Focus the greatest effort on the structural design as this has the highest weighting. Ensure a strong integration of sustainability measures to optimize the qualitative score. A sound plan of approach is essential for a competitive bid.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Award criteria
See request for quotation 5.2
See request for quotation 5.2
See request for quotation 5.2
See request for quotation 5.2.1
06Process & timeline
07Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.
08Likely competitors
09Tender documents
10Legal themes that may be relevant here
11Frequently asked questions
What is the internal reference number of the Municipality of Aalsmeer for this file?
Are there sustainability criteria applicable to this assignment?
Automatically compiled from the official tender data and documents.
12Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713