AwardedWorksEuropeanOpenGreen

AI 2024-0186 Contractors Healthy School Buildings 3rd phase

Gemeente Amsterdam, Ingenieursbureau · Open · 1 lots · 361122
Type
Works
45000000
Estimated value
€ 3,33M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amsterdam, in collaboration with an engineering firm, is launching an open tender for the third phase of the ‘Contractors Healthy School Buildings’ project. The objective is to realize new school buildings or renovate existing ones with a strong focus on a healthy indoor climate, energy efficiency, and sustainability. The assignment includes design, procurement, construction, delivery, and aftercare. The contracting authority expects an integrated approach in which the contractor complies with Dutch building and safety standards, requirements for air quality, natural light, and thermal comfort, and a clear project schedule with milestones. Evaluation criteria include experience with school projects, quality systems, environmental management, and financial capacity. The procurement is an open procedure, allowing all interested parties to participate. The contracting authority offers a clear communication and reporting structure, including a project management team and a quality control plan.

Works · Open · European procedure

Sustainability countsEuropean
Contract type
Works
Open
Estimated value
€3,333,333
awarded value
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPhealthy school buildingsschool constructionsustainable construction

01What is being requested

The Municipality of Amsterdam, in collaboration with an engineering firm, is launching an open tender for the third phase of the ‘Contractors Healthy School Buildings’ project. The objective is to realize new school buildings or renovate existing ones with a strong focus on a healthy indoor climate, energy efficiency, and sustainability. The assignment includes design, procurement, construction, delivery, and aftercare. The contracting authority expects an integrated approach in which the contractor complies with Dutch building and safety standards, requirements for air quality, natural light, and thermal comfort, and a clear project schedule with milestones. Evaluation criteria include experience with school projects, quality systems, environmental management, and financial capacity. The procurement is an open procedure, allowing all interested parties to participate. The contracting authority offers a clear communication and reporting structure, including a project management team and a quality control plan.

Contractors Healthy School Buildings 3rd phase

45000000Works
1Contractors Healthy School Buildings 3rd phase

02Outcome

Awarded

Breijer B.V.

Award value
€3,333,333
Bidders
5

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9731×
2BAM Bouw en Techniek bvSME9534×
3BINX Smartility B.V.SME9427×
4Combinatie Heijmans - SWARCOUnknown9373×
5Facilicom Solutions B.V.SME9314×
6Heijmans Utiliteit B.V.SME9227×

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of the Gezonde Schoolgebouwen Amsterdam (GSA) program?
The program was established to ensure that children in the Municipality of Amsterdam receive lessons in a healthy learning environment with sufficient fresh air and low CO2 levels.
What does the assignment for the third phase of the contractors Gezonde Schoolgebouwen entail?
The assignment concerns the realization of new school buildings or the renovation of existing school buildings, with a focus on a healthy indoor climate, energy efficiency, and sustainability.
Which aspects of the indoor climate are central to this assignment?
The contracting authority sets requirements for air quality, natural light, and thermal comfort within the school buildings.
What does the full scope of the works include?
The assignment includes the design, procurement, construction, delivery, and aftercare of the school buildings.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159