ClosedWorksEuropeanCompetitive procedure with negotiation

AI 2021-0189 - Renovation Amsterdam Museum

Gemeente Amsterdam · Competitive procedure with negotiation · 352698
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Amsterdam has launched a competitive procedure with negotiation for the renovation of the Amsterdam Museum, a national monument (Rijksmonument) of approximately 10,800 m². The contract requires a main contractor capable of coordinating both the design and engineering works as well as the construction, demolition, installation, and maintenance. The contractor must further develop the technical design, based on the UTI, into a design ready for execution, including optimizations. The works include protection, demolition, construction works, installations, and communication/BLVC. The scope requires expertise in monument renovation, building technology, installation technology, and project management within a historic city center.

Works · Competitive procedure with negotiation · European procedure

European
Contracting authority
Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
14:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderrenovationnational monumentAmsterdam Museum

01What is being requested

The Municipality of Amsterdam has launched a competitive procedure with negotiation for the renovation of the Amsterdam Museum, a national monument (Rijksmonument) of approximately 10,800 m². The contract requires a main contractor capable of coordinating both the design and engineering works as well as the construction, demolition, installation, and maintenance. The contractor must further develop the technical design, based on the UTI, into a design ready for execution, including optimizations. The works include protection, demolition, construction works, installations, and communication/BLVC. The scope requires expertise in monument renovation, building technology, installation technology, and project management within a historic city center.

For this work, the contracting authority is seeking one main contractor who is also responsible for the installations and their integration. The further development and coordination of the provided documents into a design ready for execution is part of the scope, including the offering and potential implementation of optimizations; in the UTI, the specification items where optimizations are possible are further elaborated. [Note: UTI refers to the invitation to tender]. The assignment has been elaborated by the architect and advisors in a Technical Design and is made available in the invitat

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME9627×
2Dura Vermeer Infra Regionale Projecten BVSME9658×
3KWS Infra B.V.SME9592×
4Hegeman Bouw & Infra B.V.SME9531×
5BAM Infra B.V.SME9577×
6BINX Smartility B.V.SME9527×

05Legal themes that may be relevant here

06Frequently asked questions

What is the scope of the renovation of the Amsterdam Museum?
The assignment concerns a large-scale renovation of a national monument with an area of approximately 10,800 m² GFA in the historic city center of Amsterdam.
Which works fall under the scope of the assignment?
The scope includes design and engineering works, protection and demolition works, construction works, installations including maintenance, and communication/BLVC.
What is expected of the main contractor regarding the design?
The main contractor is responsible for the further development and coordination of the provided documents into a design ready for execution, including the offering and potential implementation of optimizations.
What responsibility does the main contractor have for the installations?
The contracting authority is looking for one main contractor who is also responsible for the installations and their integration.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159