CancelledServicesEuropeanOpenGreen

AEB Amsterdam | Transport, storage and/or utilisation of CO2

AEB Amsterdam · Open · 1 lots · 233017
Type
Services
65200000
Estimated value
Not published
To deadline
-1738d
Sep 14, 2021 · 17:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

AEB Amsterdam aims to reduce its CO2 emissions by capturing CO2 from the flue gases of the HRC (≈440 kton/year), transporting it, storing it in an empty gas field in the North Sea, and potentially using it in greenhouse horticulture. The SDE++ subsidy can be applied for this purpose. AEB is seeking an executing party for a 15-year agreement that manages all phases of CCS/CCUS, including transport, storage, and possible utilisation. The tender is public and focused on a sustainable, safe, and cost-efficient execution within the framework of the Amsterdam energy agreement.

Services · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
September 14, 2021
17:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Amsterdam
CharacteristicsCPV 65ServicesEU tenderGreen / SPPCO2 captureCCSCCUS

01What is being requested

AEB Amsterdam aims to reduce its CO2 emissions by capturing CO2 from the flue gases of the HRC (≈440 kton/year), transporting it, storing it in an empty gas field in the North Sea, and potentially using it in greenhouse horticulture. The SDE++ subsidy can be applied for this purpose. AEB is seeking an executing party for a 15-year agreement that manages all phases of CCS/CCUS, including transport, storage, and possible utilisation. The tender is public and focused on a sustainable, safe, and cost-efficient execution within the framework of the Amsterdam energy agreement.

AEB Amsterdam intends to - within the framework of the energy agreement of the Municipality of Amsterdam - reduce its CO2 emissions. To this end, an SDE++ subsidy will be applied for in October 2021 for the capture of CO2 from the flue gases of the HRC (approx. 440 kton/year). The subsidy can be used for the capture and subsequent transport and storage in an empty gas field in the North Sea and potential use in greenhouse horticulture during the summer: CCS versus CCUS. For this purpose, AEB is seeking an executing party willing to perform these activities over a period of 15 years. It was alr

65200000Services
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Fudura B.V.SME51
2HetEnergieBureauUnknown51
3Jos Scholman Groen B.V.SME46
4ENGIE Infra & Mobility B.V.SME43
5Visser & Smit, Hanab installaties b.v. potentialSME39
6Worley Nederland B.V. potentialSME39

05Tender documents

TN321303 - SF06 Aankondiging van een gegunde opdracht - Nutssectoren 20210923120733pdfSep 23, 2021 · 23 KB
Koopovereenkomst inzake CCUSpdfSep 10, 2021 · 194 KB
koopovereenkomst inzake CCUS incl. track changespdfSep 10, 2021 · 200 KB
20210910 - Nota van inlichtingen 4pdfSep 10, 2021 · 133 KB
Inschrijvingsleidraad bijlage III - Eigen verklaring (UEA)pdfAug 27, 2021 · 2097 KB
Koopovereenkomst inzake CCUSpdfAug 27, 2021 · 181 KB
Bijlage 3 - Inschrijvingsleidraad incl. track changespdfAug 27, 2021 · 515 KB
20210827 - nota van inlichtingen 3pdfAug 27, 2021 · 62 KB
Bijlage 3 - InschrijvingsleidraadpdfAug 27, 2021 · 501 KB
Bijlage 1 - Beschikbare plotplan voor compressie-installatie c.q. vervloeiingsinstallatiepdfAug 27, 2021 · 169 KB
Inschrijvingsleidraad bijlage X - Verklaring omtrent rechtmatigheid inschrijving (model K)docxAug 27, 2021 · 24 KB
Inschrijvingsleidraad bijlage II- InschrijvingsstatendocxAug 27, 2021 · 26 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of this assignment?
AEB Amsterdam aims to reduce CO2 emissions by capturing CO2 from the flue gases of the HRC (approx. 440 kton/year), transporting it, and storing it in an empty gas field in the North Sea, or potentially using it in greenhouse horticulture (CCS versus CCUS).
What is the intended duration of the agreement?
AEB is seeking an executing party willing to perform the activities for the transport, storage, and/or utilisation of CO2 for a period of 15 years.
Which subsidy is this project based on?
The activities are linked to an SDE++ subsidy application for the capture of CO2 from the flue gases of the HRC in October 2021.

Automatically compiled from the official tender data and documents.