ClosedServicesEuropeanOpen

ABG251 - Framework Agreement Drilling 2025-2028

Provincie Gelderland · Open · 1 lots · 371302
Type
Services
76300000
Estimated value
€ 760K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ABG251 is a closed framework agreement from the Provincie Gelderland for civil engineering drilling (asphalt, construction, soil) including KLIC notifications and traffic measures, planned for 2025-2028.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
€760,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 76ServicesEU tender

01What is being requested

ABG251 is a closed framework agreement from the Provincie Gelderland for civil engineering drilling (asphalt, construction, soil) including KLIC notifications and traffic measures, planned for 2025-2028.

During the preparation of civil engineering projects, various aspects of the existing situation are investigated. For this purpose, asphalt, construction, and soil drilling are performed, including additional KLIC notifications. These works include the application of temporary traffic measures along with the associated requests for permission and permits.

76300000€ 760KServices
1ABG251 - Framework Agreement Drilling 2025-2028€760,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€760,000

04Likely competitors

#Likely bidderFitWins
1Arnhem Diamant BVSME67
2Geonius Groep B.V.SME50
3Sweco Nederland B.V. potentialSME38
4Combinatie Lankelma Geotechniek-Zuid [penvoerder] & Bodex Milieu potentialUnknown37
5Kanters B.V potentialSME37
6Combinatie Lankelma-Zuid [penvoerder] & Bodex Milieu potentialUnknown37

05Legal themes that may be relevant here

06Frequently asked questions

What does the framework agreement for drilling entail?
The agreement includes performing asphalt, construction, and soil drilling in preparation for civil engineering projects. This also involves performing KLIC notifications and applying temporary traffic measures, including the associated requests for permission and permits.
For which period is the framework agreement intended?
The framework agreement for drilling has a term running from 2025 to 2028.
Which specific works are part of the assignment?
The works consist of investigating the existing situation via asphalt, construction, and soil drilling. Additionally, KLIC notifications and the arrangement of temporary traffic measures and the associated permits are included.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 250K
median
€ 550K
p75
€ 1,1 mln
€ 760K

Gegunde waarden in CPV 76 · diensten n=19