OpenSuppliesEuropeanOpen

Purchase, delivery and maintenance of 2x mobile self-sufficient vacuum installations

Ministerie van Defensie · Open · 1 lots · 415484
Type
Supplies
42122430 · Centrifugal pumps
Estimated value
Not published
To deadline
-45d
May 8, 2026 · 12:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

The assignment concerns the delivery of two self-sufficient, mobile vacuum installations for suctioning waste streams for the Royal Navy. The installations must comply with specific technical, safety and ADR requirements and are to be delivered in a 20ft container design.

Supplies · Open · European procedure

European
Contracting authority
Contract type
Supplies
Open
Estimated value
Estimate not published
Submission deadline
May 8, 2026
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Centrifugal pumps
Location
Netherlands
CharacteristicsCPV 42SuppliesEU tendervacuumcentrifugal pumpsADR

01What is being requested

Purchase of two complete self-sufficient vacuum installations in a 20ft container design. The installations are intended for suction of liquids such as fuels, water and oil waste streams from naval vessels and must be mobile and modular deployable with a technical lifespan of at least 15 years.

Within the Royal Navy, the transport department carries out various activities on the naval terrain in Den Helder. This includes various cleaning activities using vacuum technology for the maintenance of the fleet. Currently, the fleet consists of a number of vacuum trucks and a number of separate vacuum units. The existing separate vacuum units cannot fulfill their mission. Furthermore, these suction units do not comply with ADR regulations. This results in the existing suction units needing to be replaced by two complete self-sufficient vacuum installations with proper certification. The new

42122430Supplies
1Purchase, delivery and maintenance of 2x mobile self-sufficient vacuum installations€1

02Strategic insight

Strategic insight · AI analysis
Ensure a full technical substantiation of the ADR and SIR compliance, as this is essential for deployment with waste streams. Verify that the 20ft container construction meets the requirements for transport (twistlocks) and lifting capacity in both empty and filled states. Anticipate the strict documentation requirements for the Technical Construction File and the maintenance regime (including OEM numbers and risk of obsolescence).
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 7
VOG/VGB-B: For every employee, it is required that they possess at least a VOG with a defense profile; without a VOG or VGB-B, no access will be granted.Important
Engineering holdpoint: The contractor may not commence production work on the installation before drawings have been approved by the Contracting Authority.Important
Review time drawings: Maximum review time is two (2) weeks with a maximum of two (2) review rounds.Important
Certification: The installation must be provided with, among other things, CE declaration, ADR certificate and SIR certificate.Important
Documentation: All documentation must be provided as hardcopy and digital (PDF).Important
Commissioning: The first commissioning on the naval terrain takes place in collaboration with an instructor / expert from the Contractor.Important
BHV: Because no BHV (Emergency Response) from DMI is available after 17:00, the Contractor must provide a certified BHV'er in case of overtime.Important

04Can I take part?

Technical · 1
The Contractor must demonstrably be VCA certified. A copy of the certificate must be attached to the tender.Technical
Professional capability · 2
All managers of the Contractor involved in the execution of the work within this scope must possess the VCA-vol diploma, including a valid safety pass.Professional capability
All employees of the Contractor involved in the execution of the work within this scope must possess the VCA diploma, including a valid safety pass.Professional capability

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

07Likely competitors

#Likely bidderFitWins
1REMONDIS Smart Infra B.V.SME8010×
2JACOBS DOUWE EGBERTS PRO NL B.V.SME76
3Hobrand B.V. SME71
4Distrimex Pompen & Service B.V.SME69
5PumpCare Benelux B.V.SME67
6Kwint B.V.SME64

08Tender documents

EISEN AAN INSCHRIJVER.pdfpdfMar 12, 2026 · 55 KB
SPECIFICATIES.pdfpdfMar 12, 2026 · 29 KB
DE INSCHRIJVING.pdfpdfMar 12, 2026 · 44 KB
Planning.pdfpdfMar 12, 2026 · 22 KB
Bijlage - Concept Raamovereenkomst Onderhoud.pdfpdfMar 12, 2026 · 331 KB
Uitsluitingsgronden.docxdocxMar 12, 2026 · 22 KB
BIJLAGE - referentieopdrachten Vacuum installaties.docxdocxMar 12, 2026 · 4 KB
Aan te leveren stukken.docxdocxMar 12, 2026 · 22 KB
AFKORTINGEN EN BEGRIPPENLIJST.pdfpdfMar 12, 2026 · 26 KB
Concept Eigendomsverklaring.pdfpdfMar 12, 2026 · 59 KB
AVWD 2021 NL.pdfpdfMar 12, 2026 · 223 KB
Beschrijving.pdfpdfMar 12, 2026 · 38 KB

09Legal themes that may be relevant here

10Frequently asked questions

Which specific technical requirements must the vacuum installations meet?
The installations must be self-sufficient, mobile for deployment at various tactical locations and modularly usable. In addition, proper ADR certification is required for the execution of the cleaning activities.
What is the main objective of the new vacuum installations?
The installations serve the maintenance of the fleet by means of cleaning activities for small or large quantities of waste substances. The new units replace the existing separate vacuum units that do not meet the mission requirements and the ADR regulations.
Which documentation is mandatory upon submission of the bid?
Bidders must provide the complete technical file, including the required ADR certification. Furthermore, the basic and support capacity must be substantiated.
What requirements are set regarding the deployability of the installations?
The self-sufficient vacuum installations must be mobile for deployment at various tactical locations and must feature a modular design for flexible deployability.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 300K
median
€ 800K
p75
€ 4,0 mln
deze opdracht

Gegunde waarden in CPV 42 · leveringen n=273