Modifying and expanding the sludge line RWZI Eindhoven

Waterschap De Dommel · Open · 1 lots · 299083
Type
Works
45252000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This project concerns the future-proof expansion of the sludge line of RWZI Eindhoven. The works include the installation of piping and pipe penetrations, the pouring of a concrete basin, the construction of a sludge digester with a pump pit, and the installation of mechanical and electrical systems. In addition, hygienic and safety measures must be implemented and general works must be carried out. The objective is to increase capacity and accommodate the increase in pollutant load.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Boxtel
CharacteristicsCPV 45Workssludge lineRWZIsludge digester

01What is being requested

This project concerns the future-proof expansion of the sludge line of RWZI Eindhoven. The works include the installation of piping and pipe penetrations, the pouring of a concrete basin, the construction of a sludge digester with a pump pit, and the installation of mechanical and electrical systems. In addition, hygienic and safety measures must be implemented and general works must be carried out. The objective is to increase capacity and accommodate the increase in pollutant load.

To make the sludge line of RWZI Eindhoven future-proof due to an increase in pollutant load and the capacity expansion of the water line of RWZI Eindhoven, the sludge line must be expanded with a third sludge thickener with a pumping station and piping. The work to be performed mainly consists of: - The installation of piping and pipe penetrations; - The installation of a cast-in-place concrete basin; - The installation of a thickened sludge pumping station and pump pit; - The entire mechanical and electrical installation; - The implementation of occupational hygiene and safety measures; - T

45252000Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1ENGIE Infra & Mobility B.V.SME10069×
2Heijmans Infra B.V.SME10065×
3Boskalis Nederland B.V.SME9969×
4Dura Vermeer Infra Regionale Projecten BVSME9858×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9526×
6Den Ouden Aannemingsbedrijf B.V.SME9423×

04Tender documents

TN413890 - SF02 Aankondiging van een opdracht 20230526110607pdfMay 26, 2023 · 28 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the works on the sludge line of RWZI Eindhoven?
The sludge line is being expanded with a third sludge thickener with a pumping station and piping to make the sludge line future-proof due to an increase in pollutant load and the capacity expansion of the water line.
Which specific works are being carried out in this project?
The works include the installation of piping and pipe penetrations, the pouring of a concrete basin, the installation of a thickened sludge pumping station and pump pit, and the installation of the entire mechanical and electrical installation.
Which additional measures and works are included in the assignment?
In addition to the technical installations, occupational hygiene and safety measures must be implemented, as well as the installation of a pit/pumping station and the performance of associated and general works.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159