Approach to bank facilities Almelo - De Haandrik Canal 2022-2029 (OS.104)

Provincie Overijssel · Open · 270983
Type
Works
45240000
Estimated value
€ 88M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Provincie Overijssel is requesting a collaborative contract for the design and execution of part of the bank facilities along the Almelo – De Haandrik canal. The objective is to maintain the canal and the bank structures to ensure safety for users and the surrounding environment. The assignment is divided into two phases: phase 1 (design) and phase 2 (execution). A construction team agreement will be concluded for the design phase; upon agreement regarding realization, execution will follow under the conditions of the UAV 2012. The tender is public, without a CPV code, and focuses on a works contract with an emphasis on collaboration between the contracting authority and the contractor.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€88,000,000
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderAlmelo canalbank facilitiesconstruction team

01What is being requested

Provincie Overijssel is requesting a collaborative contract for the design and execution of part of the bank facilities along the Almelo – De Haandrik canal. The objective is to maintain the canal and the bank structures to ensure safety for users and the surrounding environment. The assignment is divided into two phases: phase 1 (design) and phase 2 (execution). A construction team agreement will be concluded for the design phase; upon agreement regarding realization, execution will follow under the conditions of the UAV 2012. The tender is public, without a CPV code, and focuses on a works contract with an emphasis on collaboration between the contracting authority and the contractor.

This request concerns the approach to (part of the) bank facilities along the Almelo – De Haandrik canal. The purpose is to maintain the canal and the bank structures to ensure that the canal (at the locations to be addressed) remains safe for users and the immediate surroundings. It concerns Works, in a collaborative contract for the joint design with the contracting authority in a construction team arrangement and, following agreement on the execution conditions, the execution, including the necessary supplies, services, and works. This involves awarding the contract in two phases, namely: p

45240000Works

02Outcome

Awarded

Combinatie Van den Herik Kust- en Oeverwerken B.V. & De Vries Werkendam B.V.

Award value
€88,000,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Boskalis Nederland B.V.SME9869×
2KWS Infra B.V.SME9892×
3Heijmans Infra B.V.SME9867×
4Arcadis Nederland B.V.SME97116×
5Haskoning Nederland B.V.SME97100×
6Sweco Nederland B.V. SME9771×

06Legal themes that may be relevant here

07Frequently asked questions

What is the objective of the approach to the bank facilities?
The assignment aims to maintain the Almelo – De Haandrik canal and the associated bank structures, so that the canal remains safe for users and the immediate surroundings at the locations to be addressed.
How is the assignment structured in terms of phasing?
The assignment is divided into two phases: phase 1 concerns the design and phase 2 concerns the execution, including the necessary supplies, services, and works.
In what manner does the collaboration take place during the design phase?
The assignment is a collaborative contract where design is carried out in a construction team arrangement. A construction team agreement is concluded for the design phase.
Which conditions apply to the execution phase?
If agreement is reached regarding realization, execution will take place under the conditions of the UAV 2012.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 88 mln

Gegunde waarden in CPV 45 · werken n=3159