Contractor Selection HLZ | Jan van Eijckstraat 21 Amsterdam

Stichting Ceder Groep · Open · 283605
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Ceder Groep intends to award a construction team agreement followed by a construction contract via an open procedure for the project Jan van Eijckstraat 21 in Amsterdam. The construction team consists of an architect, installation advisor, structural engineer, and a contractor with an installer. The contractor acts as a construction team partner and advises on the building, structural, installation, and building physics design. Following the final design (DO), the contractor develops the design into a design ready for execution (UO) under the construction contract. The architect's aesthetic and functional principles are binding. The available construction budget is a maximum of € 2,800,000 excluding VAT, with a construction team contribution of a maximum of € 15,000 excluding VAT.

Works · Open · National procedure

Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
15:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksconstruction teamfinal designtender

01What is being requested

Stichting Ceder Groep intends to award a construction team agreement followed by a construction contract via an open procedure for the project Jan van Eijckstraat 21 in Amsterdam. The construction team consists of an architect, installation advisor, structural engineer, and a contractor with an installer. The contractor acts as a construction team partner and advises on the building, structural, installation, and building physics design. Following the final design (DO), the contractor develops the design into a design ready for execution (UO) under the construction contract. The architect's aesthetic and functional principles are binding. The available construction budget is a maximum of € 2,800,000 excluding VAT, with a construction team contribution of a maximum of € 15,000 excluding VAT.

Through the present procedure, the Contracting Authority wishes to tender a contract for a Construction Team Agreement, followed by a Construction Contract. The Construction Team, consisting of the architect, the installation advisor, the structural engineer, and the contractor with the installer, is tasked with further developing the VO into a Final Design (DO). The contractor with installer to be contracted will, during this process, act as a construction team partner advising on the building, structural, installation, and building physics design. The contractor with installer develops the F

45000000Works

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2BINX Smartility B.V.SME9927×
3Combinatie Heijmans - SWARCOUnknown9773×
4BAM Bouw en Techniek bvSME9734×
5Dura Vermeer Infra Regionale Projecten BVSME9758×
6BAM Infra B.V.SME9777×

04Tender documents

TN392283 - SF02 Aankondiging van een opdracht 20221222095534pdfDec 22, 2022 · 29 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the structure of the assignment for the contractor?
The assignment consists of a construction team agreement, followed by a construction contract. The construction team develops the Preliminary Design (VO) into a Final Design (DO). Under the construction contract, the contractor develops the DO into a Design Ready for Execution (UO).
What role does the contractor have within the construction team?
The contractor with installer acts as a construction team partner and advises on the building, structural, installation, and building physics design during the process from the VO to the DO.
Which design principles must the execution comply with?
The aesthetic and functional principles as established in the architect's drawings and impressions are binding for the execution of the works.
What is the maximum budget for the construction team contribution?
The maximum construction team contribution is € 15,000 excluding VAT.
What is the maximum available construction budget?
The available construction budget is a maximum of € 2,800,000 excluding VAT.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159