AwardedWorksEuropeanRestricted

Construction team contractor for new construction of community center with 12 apartments and gym facility

De Connectie voor Gemeente Arnhem · Restricted · 1 lots · 293591
Type
Works
45210000
Estimated value
€ 5,62M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

De Connectie, commissioned by Volkshuisvesting Arnhem and Municipality of Arnhem, is seeking one contractor as a ‘construction team contractor’ for the new construction of a community center with 12 apartments and a gym facility at Zwanenbloemlaan, Arnhem. The project follows a construction team phase: from VO (preliminary design) to UO (operational handover) with a clear timeline – construction preparation (October 2023 – February 2024), realization (February 2024 – May 2024), operational handover (June 2024), and opening (June 2025). The tender is non-public, aimed at an integrated approach where design, preparation, and execution are managed by a single party. The contractor must meet requirements for quality, sustainability, safety, and social inclusion, and must have experience with similar residential and sports facilities in an urban environment. The agreement covers the entire construction process, including project management, technical execution, quality control, and aftercare.

Works · Restricted · European procedure

European
Contracting authority
Gelderland
Contract type
Works
Restricted
Estimated value
€5,619,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Arnhem, Gelderland
CharacteristicsCPV 45WorksEU tenderconstruction teamnew constructioncommunity center

01What is being requested

De Connectie, commissioned by Volkshuisvesting Arnhem and Municipality of Arnhem, is seeking one contractor as a ‘construction team contractor’ for the new construction of a community center with 12 apartments and a gym facility at Zwanenbloemlaan, Arnhem. The project follows a construction team phase: from VO (preliminary design) to UO (operational handover) with a clear timeline – construction preparation (October 2023 – February 2024), realization (February 2024 – May 2024), operational handover (June 2024), and opening (June 2025). The tender is non-public, aimed at an integrated approach where design, preparation, and execution are managed by a single party. The contractor must meet requirements for quality, sustainability, safety, and social inclusion, and must have experience with similar residential and sports facilities in an urban environment. The agreement covers the entire construction process, including project management, technical execution, quality control, and aftercare.

Volkshuisvesting Arnhem and Municipality of Arnhem wish to enter into an agreement with one contractor as a 'construction team contractor' for the New Construction Community Center with 12 apartments and gym facility at Zwanenbloemlaan in Arnhem. Construction team phase; VO development to DO and subsequently up to a UO; - October 2023 - February 2024: Construction preparation; - February 2024 - May 2024: Realization of new construction; - June 2024: Handover fully operational and ready for business; - June 2025: Opening / Commissioning.

45210000€ 5,62MWorks
1Lot 1€5,619,000

02Outcome

Awarded

Rots Bouw B.V.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€5,619,000

05Bidders in this segment

#Likely bidderFitWins
1BINX Smartility B.V.SME9627×
2Van Gelder BVSME9553×
3BAM Infra B.V.SME9377×
4Combinatie Heijmans - SWARCOUnknown9373×
5Dura Vermeer Infra Regionale Projecten BVSME9358×
6BAM Bouw en Techniek bvSME9334×

06Tender documents

TN405813 - SF02 Aankondiging van een opdracht 20230405160427pdfApr 5, 2023 · 32 KB

07Legal themes that may be relevant here

08Frequently asked questions

What is the scope of the construction project?
The project concerns the new construction of a community center including 12 apartments and a gym facility.
What is the schedule for the construction team phase?
Construction preparation takes place from October 2023 to February 2024, followed by the realization of the new construction from February 2024 to May 2024.
When will the project be handed over and opened?
The project will be handed over fully operational and ready for business in June 2024, with the final opening and commissioning in June 2025.
Which phases are covered within the construction team phase?
The assignment includes the construction team phase from VO development to DO and subsequently up to a UO.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 5,6 mln

Gegunde waarden in CPV 45 · werken n=3159