Construction of rapid bicycle route Ede – Wageningen, Churchillweg – Hoevestein section
The Municipality of Wageningen has a non-public tender for the construction of a rapid bicycle route between Ede and Wageningen, specifically the section from Churchillweg to Hoevestein. The project involves realizing a main bicycle connection within the existing infrastructure, including additional works such as temporary traffic measures, sewerage works (including the disconnection of rainwater from DWA), paving with elements, and asphalt surfacing. The assignment focuses on an integrated approach in which the bicycle route must connect safely, sustainably, and functionally to existing roads and infrastructure. The works require good coordination between traffic management, water management, and road maintenance, with attention to minimal disruption to traffic and the surrounding environment.
Works · Restricted · National procedure
01What is being requested
The Municipality of Wageningen has a non-public tender for the construction of a rapid bicycle route between Ede and Wageningen, specifically the section from Churchillweg to Hoevestein. The project involves realizing a main bicycle connection within the existing infrastructure, including additional works such as temporary traffic measures, sewerage works (including the disconnection of rainwater from DWA), paving with elements, and asphalt surfacing. The assignment focuses on an integrated approach in which the bicycle route must connect safely, sustainably, and functionally to existing roads and infrastructure. The works require good coordination between traffic management, water management, and road maintenance, with attention to minimal disruption to traffic and the surrounding environment.
Realizing a main bicycle connection in the existing infrastructure with additional works including temporary traffic measures, sewerage works including disconnection of rainwater from DWA, paving with elements, and asphalt surfacing.
02Outcome
Hoornstra Infrabouw
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What does the assignment for the construction of the rapid bicycle route entail?
What specific works are carried out regarding the sewerage?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159