AwardedWorksRestricted

Construction of rapid bicycle route Ede – Wageningen, Churchillweg – Hoevestein section

Gemeente Wageningen · Restricted · 273488
Type
Works
45222000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Wageningen has a non-public tender for the construction of a rapid bicycle route between Ede and Wageningen, specifically the section from Churchillweg to Hoevestein. The project involves realizing a main bicycle connection within the existing infrastructure, including additional works such as temporary traffic measures, sewerage works (including the disconnection of rainwater from DWA), paving with elements, and asphalt surfacing. The assignment focuses on an integrated approach in which the bicycle route must connect safely, sustainably, and functionally to existing roads and infrastructure. The works require good coordination between traffic management, water management, and road maintenance, with attention to minimal disruption to traffic and the surrounding environment.

Works · Restricted · National procedure

Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
13:30
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksrapid bicycle routeinfrastructuretraffic measures

01What is being requested

The Municipality of Wageningen has a non-public tender for the construction of a rapid bicycle route between Ede and Wageningen, specifically the section from Churchillweg to Hoevestein. The project involves realizing a main bicycle connection within the existing infrastructure, including additional works such as temporary traffic measures, sewerage works (including the disconnection of rainwater from DWA), paving with elements, and asphalt surfacing. The assignment focuses on an integrated approach in which the bicycle route must connect safely, sustainably, and functionally to existing roads and infrastructure. The works require good coordination between traffic management, water management, and road maintenance, with attention to minimal disruption to traffic and the surrounding environment.

Realizing a main bicycle connection in the existing infrastructure with additional works including temporary traffic measures, sewerage works including disconnection of rainwater from DWA, paving with elements, and asphalt surfacing.

45222000Works

02Outcome

Awarded

Hoornstra Infrabouw

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Heijmans Infra B.V.SME10065×
3Dura Vermeer Infra Regionale Projecten BVSME9858×
4Boskalis Nederland B.V.SME9769×
5ENGIE Infra & Mobility B.V.SME9769×
6Van Gelder BVSME9753×

05Tender documents

TN378052 - SF03 Aankondiging van een gegunde opdracht 20230222112415pdfFeb 22, 2023 · 24 KB
W-08-21-SL-220922 Selectieleidraad SFREW-v1.2pdfOct 6, 2022 · 282 KB
Nota van inlichtingen 2022-10-06-2pdfOct 6, 2022 · 8 KB
Nota van inlichtingen 2022-09-30-1pdfSep 30, 2022 · 3 KB
TN378052 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20220928140840pdfSep 28, 2022 · 13 KB
Bijlage I - UEApdfSep 28, 2022 · 2097 KB
TN378052 - SF02 Aankondiging van een opdracht 20220926143756pdfSep 26, 2022 · 32 KB
Bijlage III - format Verklaring DerdedocxSep 26, 2022 · 30 KB
2106401-BE-03-T32pdfSep 26, 2022 · 1407 KB
2106401-BE-03-D44pdfSep 26, 2022 · 1380 KB
W-08-21-SL-220922 Selectieleidraad SFREW-v1.0pdfSep 26, 2022 · 739 KB
Bijlage II - format referentiesdocxSep 26, 2022 · 29 KB

06Legal themes that may be relevant here

07Frequently asked questions

What does the assignment for the construction of the rapid bicycle route entail?
The assignment includes realizing a main bicycle connection in the existing infrastructure between Churchillweg and Hoevestein. The works include, among other things, paving with elements, asphalt surfacing, sewerage works including the disconnection of rainwater from the DWA, and the implementation of temporary traffic measures.
What specific works are carried out regarding the sewerage?
During the realization of the rapid bicycle route, sewerage works will be carried out, in which specifically the disconnection of rainwater from the DWA (dual water drainage) forms part of the assignment.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159