ClosedWorksEuropeanOnderhandeling zonder bekendmakingGreen

Construction, operation, maintenance and replacement of a heat network in the Reyeroord Zuid-West area

Gemeente Rotterdam · Onderhandeling zonder bekendmaking · 1 lots · 365833
Type
Works
45232140
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

This offer concerns the planning, realization, operation, maintenance and replacement of a heat network for the Reyeroord Zuid-West area in Rotterdam. The contracting party shall carry out the construction at its own risk during the period 2025-2030 and must provide the operation, maintenance and replacement for a period of 17 years (until 2043). There are at least two and possibly a third connection moment for existing buildings. After the third moment, the party must also provide any additional connections upon request.

Works · Onderhandeling zonder bekendmaking · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPP

01What is being requested

This offer concerns the planning, realization, operation, maintenance and replacement of a heat network for the Reyeroord Zuid-West area in Rotterdam. The contracting party shall carry out the construction at its own risk during the period 2025-2030 and must provide the operation, maintenance and replacement for a period of 17 years (until 2043). There are at least two and possibly a third connection moment for existing buildings. After the third moment, the party must also provide any additional connections upon request.

The agreement concerns the realization, operation, maintenance and replacement of a heat network in the Reyeroord Zuid-West area in the municipality of Rotterdam for connecting existing buildings. Realization takes place by the contracting party at its own expense and risk in the period 2025-2030, after which the contracting party will be responsible for the operation, maintenance and replacement of the heat network for a period of 17 years (2043) for the purpose of supplying industrial waste heat to the (future) consumers of the Reyeroord Zuid-West area. There will be at least two and possibl

45232140Works
1Construction, operation, maintenance and replacement of a heat network in the Reyeroord Zuid-West area

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9592×
2Heijmans Infra B.V.SME9565×
3Combinatie Heijmans - SWARCOUnknown9373×
4Dura Vermeer Infra Regionale Projecten BVSME9258×
5ENGIE Infra & Mobility B.V.SME8769×
6Heijmans Utiliteit B.V.SME8727×

05Legal themes that may be relevant here

06Frequently asked questions

What does the assignment for the heat network in Reyeroord Zuid-West entail?
The assignment includes the realization, operation, maintenance and replacement of a heat network for the supply of industrial waste heat to existing buildings in the Reyeroord Zuid-West area.
In which period will the realization of the heat network take place?
The realization of the heat network will take place by the contracting party at its own expense and risk in the period 2025-2030.
What is the total duration of the operation, maintenance and replacement?
After the realization period, the contracting party will provide the operation, maintenance and replacement of the heat network for a period of 17 years, until 2043.
How many connection moments for existing buildings are provided for?
There are at least two and possibly three connection moments for building owners. Additionally, the contracting party is obliged to also provide additional connections after the third connection moment upon request of potential customers.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159