ClosedServicesEuropeanOpen

Installation of dark fiber connection between datacenters Pijnacker and Rotterdam + internet access at both locations

Gemeente Pijnacker-Nootdorp · Open · 384176
Type
Services
72400000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The purpose of this procedure is to establish a dark fiber connection between the datacenters in Pijnacker and Rotterdam, and a managed internet connection at both locations. The dark fiber is intended for the continuous synchronization of data sets, while the internet connection provides 2 Gbit/s per location and functions as a failover path in the event of dark fiber failure.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
11:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 72ServicesEU tender

01What is being requested

The purpose of this procedure is to establish a dark fiber connection between the datacenters in Pijnacker and Rotterdam, and a managed internet connection at both locations. The dark fiber is intended for the continuous synchronization of data sets, while the internet connection provides 2 Gbit/s per location and functions as a failover path in the event of dark fiber failure.

The objective of this procurement procedure is to establish an agreement with a single contractor who, on behalf of the Municipality of Pijnacker-Nootdorp, is responsible for: the realization and delivery of a dark fiber connection between the municipal datacenter in Pijnacker and the SmartDC datacenter in Rotterdam; the dark fiber will be used for the continuous synchronization of data sets in both datacenters; the realization and delivery of a managed internet connection at both locations, with an initial capacity of 2 Gbit/s per location and the possibility for future capacity expansion; t

72400000Services

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1KPN B.V.SME9731×
2Axians Communication Solutions B.V.SME8828×
3PinkRoccade Local Government B.V.SME8734×
4Protinus IT B.V.SME8635×
5COMPAREX Nederland B.V.SME8530×
6Odin Onderwijs B.V. h.o.d.n. CloudwiseSME8518×

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of the dark fiber connection?
The dark fiber connection is being established between the municipal datacenter in Pijnacker and the SmartDC datacenter in Rotterdam for the continuous synchronization of data sets in both datacenters.
What specifications apply to the internet connection?
A managed internet connection must be delivered at both locations with an initial capacity of 2 Gbit/s per location, where future capacity expansion must be possible.
How must the infrastructure function in the event of dark fiber failure?
The internet connections must be configured such that they together function as a 'failover' path in the event of the dark fiber connection failing.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
deze opdracht

Gegunde waarden in CPV 72 · diensten n=1436