ClosedSuppliesEuropeanOnderhandeling zonder bekendmaking

Announcement of voluntary transparency prior to - Fiber optic ROCMN

Stichting ROC Midden Nederland · Onderhandeling zonder bekendmaking · 301299
Type
Supplies
32561000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

ROC Midden Nederland (ROCMN) is seeking a supplier for a geographically redundant dark fiber connection between Maatweg 3 and Disketteweg 10 in Amersfoort. The current situation is limited to proprietary fiber optic lines; the exception concerns a connection that cannot be provided by the current supplier without high transition costs. A market study shows that other parties cannot provide the service or charge high one-off costs. A feasibility study indicates that the buildings cannot be accessed redundantly due to the absence of a data ring and that the site is only accessible from one side. Additionally, the installation must include a shared trench/boring under the railway, for which permits are highly unlikely. The procurement follows a voluntary transparency procedure and will be carried out via negotiations without prior publication. The contracting authority requires a solution that provides the necessary redundancy, takes into account the limited access and the complex regulations regarding railway lands, and does not entail unnecessary transition costs.

Supplies · Onderhandeling zonder bekendmaking · European procedure

European
Contracting authority
Contract type
Supplies
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 32SuppliesEU tenderdark fibergeographically redundanttransit costs

01What is being requested

ROC Midden Nederland (ROCMN) is seeking a supplier for a geographically redundant dark fiber connection between Maatweg 3 and Disketteweg 10 in Amersfoort. The current situation is limited to proprietary fiber optic lines; the exception concerns a connection that cannot be provided by the current supplier without high transition costs. A market study shows that other parties cannot provide the service or charge high one-off costs. A feasibility study indicates that the buildings cannot be accessed redundantly due to the absence of a data ring and that the site is only accessible from one side. Additionally, the installation must include a shared trench/boring under the railway, for which permits are highly unlikely. The procurement follows a voluntary transparency procedure and will be carried out via negotiations without prior publication. The contracting authority requires a solution that provides the necessary redundancy, takes into account the limited access and the complex regulations regarding railway lands, and does not entail unnecessary transition costs.

ROC MN primarily uses fiber optic lines in its own possession for connections between its locations and the Internet. An exception to this is the fiber optic connection between Maatweg 3 and Disketteweg 10 in Amersfoort. In anticipation of a new procurement, a market study was conducted. Regarding the delivery of the required (geographically redundant) dark fiber connection, it emerged that other parties, besides the current supplier, cannot provide the requested service or that a very high one-off amount in transition costs is charged. A feasibility study has shown that the buildings in quest

32561000Supplies

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for leveringen is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1KPN B.V.SME76
2Eurofiber NederlandUnknown75
3Odin Onderwijs B.V. h.o.d.n. CloudwiseSME7512×
4TReNT Infrastructuur B.V.SME73
5Dustin Netherlands B.V.SME7112×
6EurofiberUnknown71

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific technical requirement of this assignment?
The assignment concerns the delivery of a geographically redundant dark fiber connection between the locations Maatweg 3 and Disketteweg 10 in Amersfoort.
Why was this specific procurement approach chosen?
A market study showed that other parties besides the current supplier cannot provide the requested service, or that very high one-off transition costs are charged.
Which physical constraints were identified regarding the access to the buildings?
A feasibility study indicates that the buildings cannot be accessed redundantly due to the absence of a data ring. Additionally, the site is only accessible from one side.
What risks are associated with the required infrastructure?
The installation requires a shared trench or boring under the railway, where the chance of obtaining the necessary permits is very small.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 340K
median
€ 750K
p75
€ 2,2 mln
deze opdracht

Gegunde waarden in CPV 32 · leveringen n=274