Tender for executing parties for the renovation of vmbo UGO Apeldoorn

Stichting Veluwse Onderwijsgroep · Restricted · 3 lots · 292136
Type
Works
45000000
Estimated value
€ 1,17M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Veluwse Onderwijsgroep Apeldoorn intends to enter into a contract for the revitalization and renovation of the vmbo building UGO Apeldoorn. The objective is to make the building future-proof for the next 20 years, to improve sustainability, and to ensure a healthy indoor climate. The assignment focuses on structural and aesthetic improvements, energy efficiency, improvement of air and water quality, and the creation of flexible learning environments. The procurement is conducted via a non-public procedure, meaning the selection of executing parties is limited to a predefined pool. The contracting authority expects an integrated approach with attention to sustainability, safety, and pedagogical functionality, including compliance with current building and environmental standards.

Works · Restricted · European procedure · SME-friendly

SME-friendlySustainability countsEuropean
Contract type
Works
Restricted
Estimated value
€1,172,646
awarded value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
3
3 lots
Main CPV code
Location
Apeldoorn
CharacteristicsCPV 45WorksSME-friendlyEU tenderGreen / SPPrenovationvmboUGO Apeldoorn

01What is being requested

Stichting Veluwse Onderwijsgroep Apeldoorn intends to enter into a contract for the revitalization and renovation of the vmbo building UGO Apeldoorn. The objective is to make the building future-proof for the next 20 years, to improve sustainability, and to ensure a healthy indoor climate. The assignment focuses on structural and aesthetic improvements, energy efficiency, improvement of air and water quality, and the creation of flexible learning environments. The procurement is conducted via a non-public procedure, meaning the selection of executing parties is limited to a predefined pool. The contracting authority expects an integrated approach with attention to sustainability, safety, and pedagogical functionality, including compliance with current building and environmental standards.

Veluwse Onderwijsgroep Apeldoorn intends to enter into an agreement for the realization of revitalization/renovation of the vmbo building UGO Apeldoorn. This building must be made suitable for future-proof education for the next 20 years and, additionally, be made more sustainable to ensure the building is easy to operate and achieves a good indoor climate.

45000000Works
1Lot 1
2Lot 2
3Lot 3

02Outcome

Awarded

Van Dorp Installaties B.V.

Award value
€1,172,646

03Breakdown by lot

Lot 1n/a
Lot 2n/a
Lot 3n/a

Per-lot values not published — bars show only the lot breakdown.

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Bidders in this segment

#Likely bidderFitWins
1Van Gelder BVSME9753×
2Hegeman Bouw & Infra B.V.SME9631×
3BAM Bouw en Techniek bvSME9634×
4Heijmans Utiliteit B.V.SME9627×
5BINX Smartility B.V.SME9627×
6Unica Installatietechniek B.V.SME9513×

07Legal themes that may be relevant here

08Frequently asked questions

What is the objective of the renovation of the vmbo building UGO Apeldoorn?
The objective is the realization of revitalization and renovation to make the building suitable for future-proof education for the next 20 years, to improve sustainability for efficient operation, and to ensure a good indoor climate.
Which aspects of building operation does this assignment focus on?
The assignment focuses on making the building more sustainable to ensure efficient operation and on creating a good indoor climate.
What is the intended lifespan of the improvements to the building?
Through the works, the building must be made suitable for future-proof education for the next 20 years.

Automatically compiled from the official tender data and documents.

09Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 5,6 mln

Gegunde waarden in CPV 45 · werken n=3159