AwardedWorksEuropeanSME-friendlyRestricted

Tender for executing parties KPO KC Jeroen Bosch

Stichting Katholiek Primair Onderwijs Roosendaal · Restricted · 3 lots · 353083
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Katholiek Primair Onderwijs Roosendaal (KPO Roosendaal) has issued a tender for the construction of a new Child Centre on the plot adjacent to the current Jeroen Bosch building. The project comprises a gross floor area of approximately 2,750 m² spread over two floors, with the construction consisting largely of wood. In addition to regular school facilities, childcare and BSO facilities will also be realized under internal management. The new building must integrate seamlessly with the existing infrastructure, comply with Dutch building and safety standards, and take into account accessibility, energy efficiency, and sustainable materials. The procedure is non-public, meaning a limited number of certified parties will be invited. The contracting authority expects an integrated approach to design, construction, and project management, with an emphasis on quality, timely delivery, and cost control.

Works · Restricted · European procedure · SME-friendly

SME-friendlyEuropean
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
3
3 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderChild Centrenew constructiontimber construction

01What is being requested

Stichting Katholiek Primair Onderwijs Roosendaal (KPO Roosendaal) has issued a tender for the construction of a new Child Centre on the plot adjacent to the current Jeroen Bosch building. The project comprises a gross floor area of approximately 2,750 m² spread over two floors, with the construction consisting largely of wood. In addition to regular school facilities, childcare and BSO facilities will also be realized under internal management. The new building must integrate seamlessly with the existing infrastructure, comply with Dutch building and safety standards, and take into account accessibility, energy efficiency, and sustainable materials. The procedure is non-public, meaning a limited number of certified parties will be invited. The contracting authority expects an integrated approach to design, construction, and project management, with an emphasis on quality, timely delivery, and cost control.

For KPO Roosendaal, a new Child Centre must be realized next to the current Jeroen Bosch location. At the Jeroen Bosch location, in addition to school, childcare and BSO will also take place under internal management. The location for this new construction is situated on the plot next to the current old building of KPO Jeroen Bosch in Roosendaal. [newline] The project has a total gross floor area of approximately 2,750 m², spread over two floors. The construction will consist largely of wood.

45000000Works
1Lot 1 Building works
2Lot 2 Mechanical installations
3Lot 3 Electrical installations

02Breakdown by lot

Lot 1 Building worksn/a
Lot 2 Mechanical installationsn/a
Lot 3 Electrical installationsn/a

Per-lot values not published — bars show only the lot breakdown.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9731×
2Boskalis Nederland B.V.SME9569×
3KWS Infra B.V.SME9492×
4BINX Smartility B.V.SME9427×
5Kernbouw B.V.SME9311×
6Croonwolter&dros B.V.SME9225×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the new construction project for the Child Centre?
The project concerns the realization of a new construction Child Centre with a total gross floor area of approximately 2,750 m², spread over two floors.
What are the characteristics of the construction to be realized?
The construction of the new Child Centre will consist largely of wood.
Which facilities will be housed in the new Child Centre?
In addition to regular school facilities, childcare and BSO facilities will also be realized in the building under internal management.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159