ClosedWorksMarktconsultatie

A08.274.2022 Market Consultation Circular Demolition Stationsplein 107 Municipality of Leiden

Servicepunt71 namens de gemeente Leiden · Marktconsultatie · 1 lots · 273514
Type
Works
45110000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Leiden is organizing a market consultation for the circular demolition of the building at Stationsplein 107, built in 1965. The building is currently serving as temporary shelter for Ukrainian refugees and will be made ready for construction for housing after demolition. The demolition must take place no later than the beginning of October 2023, unless a delay occurs due to extended operation. The municipality is seeking market input regarding the best approach, including methods for the circular processing of construction materials, safety and environmental standards, and an efficient conversion to residential space. The consultation offers the opportunity for a written response and, if necessary, an oral explanation. The inquiry focuses on a sustainable, cost-conscious, and timely execution, with attention to the local context and the needs of the refugee shelter.

Works · Marktconsultatie · National procedure

Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Leiden
CharacteristicsCPV 45Workscircular demolitionStationsplein 107Leiden

01What is being requested

The Municipality of Leiden is organizing a market consultation for the circular demolition of the building at Stationsplein 107, built in 1965. The building is currently serving as temporary shelter for Ukrainian refugees and will be made ready for construction for housing after demolition. The demolition must take place no later than the beginning of October 2023, unless a delay occurs due to extended operation. The municipality is seeking market input regarding the best approach, including methods for the circular processing of construction materials, safety and environmental standards, and an efficient conversion to residential space. The consultation offers the opportunity for a written response and, if necessary, an oral explanation. The inquiry focuses on a sustainable, cost-conscious, and timely execution, with attention to the local context and the needs of the refugee shelter.

Stationsplein 107 was built in 1965 and initially served as a tax office and later as an office building for the Municipality of Leiden. It has currently been converted for the temporary shelter of Ukrainian refugees. The demolition works will start at the earliest at the beginning of October 2023, unless there is a delay due to the extended operation of the building. After the building has been circularly demolished, the site will be made ready for construction for housing. The Municipality of Leiden is orienting itself on the way in which it can best issue this inquiry. It wishes to involve

45110000Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9092×
2BAM Infra B.V.SME8977×
3Combinatie Heijmans - SWARCOUnknown8873×
4Dura Vermeer Infra Regionale Projecten BVSME8658×
5BAM Bouw en Techniek bvSME8434×
6Hegeman Bouw & Infra B.V.SME8331×

04Tender documents

TN378362 - SF01 Vooraankondiging 20220926161754pdfSep 28, 2022 · 17 KB
Marktconsultatiedocument Circulaire Sloop Stationsplein 107pdfSep 28, 2022 · 530 KB
01-07-2022 Memo Cirdax Stationsplein 107 Leiden (Definitief) (vs MS)docxSep 28, 2022 · 64 KB
01-07-2022 MaterialenpaspoortenzipSep 28, 2022 · 245888 KB
Plattegronden STP 107zipSep 28, 2022 · 13049 KB
2490816 - Asbestinventarisatie (Stationsplein 107 te Leiden)_rev00pdfSep 28, 2022 · 7627 KB
Bijlage Beantwoordingsformulier Circulaire Sloop Stationsplein 107 Gemeente LeidendocxSep 28, 2022 · 17 KB
01-07-2022 DATA Export Materialen Paspoorten - Stationsplein 107 LeidenxlsxSep 28, 2022 · 99 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the purpose of this market consultation?
The Municipality of Leiden is orienting itself on the way in which the circular demolition of the building at Stationsplein 107 can best be issued. The municipality wishes to involve market input to be able to make a sound decision regarding the approach to this assignment.
What is the intended schedule for the demolition works?
The demolition works will start at the earliest at the beginning of October 2023. This is subject to any potential delay if the building is operated for a longer period for its current function as temporary shelter.
What is the desired outcome after the demolition of the building?
The building at Stationsplein 107, built in 1965, must be circularly demolished. After the demolition works, the site must be made ready for construction for the realization of housing.
In what manner can market parties respond to the inquiry?
The market consultation offers the possibility of a written response. If necessary, an oral explanation can also take place at the request of the Municipality of Leiden.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159