AwardedServicesEuropeanOpen

31204340 RWS Support QBLOK

Type
Services
72000000
Estimated value
€ 120K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

QBLOK is an assignment model that analyzes the interaction between transport demand and road supply to determine congestion and accessibility.

Services · Open · European procedure

European
Contract type
Services
Open
Estimated value
€120,000
awarded value
Submission deadline
Ongoing
08:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 72ServicesEU tender

01What is being requested

The QBLOK program is an assignment module of the GroeiModel (GM) that confronts transport demand with the road supply to determine road loading, congestion, and accessibility.

In the present assignment, WVL requests support for the management, updating, further development, and application of QBLOK, the assignment module of the LMS and NRM.

72000000Services
132104340 RWS Support QBLOK

02Outcome

Awarded

4cast B.V.

Award value
€120,000
Bidders
2

03Strategic insight

Strategic insight · AI analysis
Ensure a profound understanding of the assignment methodology and the specific iterative processes. Take into account the various user groups and the associated travel time valuations. Verify the compatibility with the input data such as network links and movement matrices.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 3
The assignment is a static congestion-sensitive technique.Important
The algorithm utilizes the tonenmethodiek of TRANSPUTE.Important
A separate call and user interface is required for the calculation of reliability.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Centric Netherlands B.V.SME9256×
2Visma Roxit B.V.SME9216×
3Conclusion B.V.SME9218×
4Ordina Unknown9120×
5PQR B.V.SME8825×
6KPMG Advisory N.V.SME8815×

08Tender documents

TN524913 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250804132811pdfAug 5, 2025 · 8 KB
ProcesVerbaalOpeningKluis_TN524913pdfAug 5, 2025 · 2 KB
Nota van inlichtingen 2025-05-22-1pdfMay 22, 2025 · 4 KB
Nota van inlichtingen 2025-05-14-1pdfMay 14, 2025 · 3 KB
uea_524913_20250430122603pdfMay 3, 2025 · 330 KB
31204340 Bijlage F EMVI-BKPV tabelpdfMay 3, 2025 · 248 KB
31204340 AanbestedingsleidraadpdfMay 3, 2025 · 865 KB
31204340 Bijlage Vraagspecificatie Memo_qblok6(240214)pdfMay 3, 2025 · 838 KB
31204340 Bijlage D InschrijvingsbiljetpdfMay 3, 2025 · 206 KB
31204340 Bijlage D InschrijvingsbiljetdocxMay 3, 2025 · 35 KB
31204340 Bijlage B Aanvullende Eigen VerklaringdocxMay 3, 2025 · 42 KB
31204340 Bijlage G Verklaring inzake MSenA v1.0docxMay 3, 2025 · 39 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the substantive core of the assignment for QBLOK?
The assignment concerns support for the management, updating, further development, and application of QBLOK, the assignment module of the LMS and NRM.
What is the duration of the agreement for the support of QBLOK?
The agreement has a duration of 2 years, with the option for extension of 2x 1 year.
Which methodological tasks fall under the QBLOK program?
The methodology includes, among others, the assignment methodology, policy modeling (such as adjustments in infrastructure, costs, and the Pae factor), congestion determination, determining link times and accessibility, as well as secondary tasks such as selected link analysis and reliability calculations.
Which specific parameters are handled within the QBLOK methodology?
The methodology covers, among others, the modeling of the Pae factor, travel time valuation, congestion modeling, pricing, ZRA, and the calculation of reliability and link times.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 327K
median
€ 800K
p75
€ 2,5 mln
€ 120K

Gegunde waarden in CPV 72 · diensten n=1436