31203484: Adjustment of sliding stops Oosterscheldekering phase 1

Rijkswaterstaat Programma's, Projecten en Onderhoud · Onderhandeling zonder bekendmaking · 1 lots · 368854
Type
Works
45350000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. The contracting authority, Rijkswaterstaat Programma's, Projecten en Onderhoud, has a closed procedure without publication (works) around 28 budget amounts. No CPV code, value, or deadline has been specified, but the works for at least 12 gates are planned from 1 April 2025.

Works · Onderhandeling zonder bekendmaking · National procedure

Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. The contracting authority, Rijkswaterstaat Programma's, Projecten en Onderhoud, has a closed procedure without publication (works) around 28 budget amounts. No CPV code, value, or deadline has been specified, but the works for at least 12 gates are planned from 1 April 2025.

A large part of the sliding stops on the gates of the Oosterscheldekering require replacement. Recent research has shown that this must be addressed on 22 gates with great urgency. The scope of the project includes revising the sliding stops and revising the spring element on 22 gates of the Oosterscheldekering. The revision of the sliding stops concerns the re-conserving of the steel sockets and the custom-making ('planing') of the plastic guide blocks, the so-called counter-molds. For at least 12 gates, the execution works must take place in 2025, with the start of execution on 1 April 2025

45350000Works
1Main contract: Renovation of sliding stops Oosterscheldekering phase 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9392×
2Combinatie Heijmans - SWARCOUnknown9173×
3Heijmans Infra B.V.SME9165×
4Boskalis Nederland B.V.SME9069×
5BAM Infra B.V.SME8877×
6ENGIE Infra & Mobility B.V.SME8569×

04Legal themes that may be relevant here

05Frequently asked questions

What is the exact scope of the works at the Oosterscheldekering?
The assignment concerns the revision of the sliding stops and the revision of the spring element on 22 gates of the Oosterscheldekering.
Which specific works fall under the revision of the sliding stops?
The revision of the sliding stops includes re-conserving the steel sockets and the custom-making (planing) of the plastic guide blocks, also known as counter-molds.
When must the works on the gates be carried out?
For at least 12 gates, the execution works must take place in 2025, with a start of execution on 1 April 2025. Preference is given to performing all 22 gates in 2025, provided this is safely executable.
Is it possible to carry out works during the storm season?
Carrying out the works during the storm season is negotiable.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159