AwardedWorksOpen

31193275 Realisation of Noise Barriers A4 Dinteloord & A17 Standdaarbuiten

Type
Works
45233120
Estimated value
€ 3,27M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Realisation of noise barriers on the A17 and A4 motorways in the Netherlands; contract executed by a contractor for preliminary design, design, and construction of the system.

Works · Open · National procedure

Contract type
Works
Open
Estimated value
€3,274,000
awarded value
Submission deadline
Ongoing
15:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

Realisation of noise barriers on the A17 and A4 motorways in the Netherlands; contract executed by a contractor for preliminary design, design, and construction of the system.

The A17 motorway is a motorway in the Netherlands, running from Klaverpolder junction near Moerdijk to De Stok junction near Roosendaal. The A4 motorway is a motorway in the Netherlands, part of which is located in the Province of Noord-Brabant, from Markiezaat junction to Sabina junction. The contractor must primarily perform various works: - Designing and realising the system (noise barriers). Preparing, coordinating, and submitting for acceptance the integral design of the system (noise barriers) suitable for execution. - Submitting the integral design of the system for acceptance as being

45233120Works
131193275 Realisation of Noise Barriers A4 Dinteloord & A17 Standdaarbuiten.

02Outcome

Awarded

Heijmans Infra B.V.

Award value
€3,274,000
Bidders
2

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown10075×
2Heijmans Infra B.V.SME9868×
3Dura Vermeer Infra Regionale Projecten BVSME9658×
4Boskalis Nederland B.V.SME9469×
5Gebr. van Kessel Wegenbouw B.V.SME9320×
6KWS Infra B.V.SME9292×

05Legal themes that may be relevant here

06Frequently asked questions

What is the core of the assignment for the realisation of the noise barriers?
The assignment includes the design and realisation of the system for the noise barriers. This means that the contractor prepares, coordinates, and submits the integral design for acceptance, whereby the design must be suitable for execution.
Which works fall under the scope of the assignment?
The works consist of the design and realisation of the system. The contractor must prepare, coordinate, and submit the integral design of the noise barriers for acceptance, such that the design is suitable for execution.
On which sections of the motorways do the works take place?
The works concern the A17 motorway, which runs from Klaverpolder junction near Moerdijk to De Stok junction near Roosendaal, and the A4 motorway, which runs in the province of Noord-Brabant from Markiezaat junction to Sabina junction.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 3,3 mln

Gegunde waarden in CPV 45 · werken n=3159