31187271 - ViA15 Groundwater Dossier

Rijkswaterstaat Water, Verkeer en Leefomgeving · Onderhandeling zonder bekendmaking · 311208
Type
Services
71335000
Estimated value
€ 129K
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The assignment from Rijkswaterstaat concerns determining the governing hydraulic design load for the Depressed Alignment in the ViA15 project. An analysis is requested for four sub-components: an open box construction, a closed box construction, a PVC foil construction, and a dive-under. All constructions include sheet piles with tension anchors, an underwater concrete and construction floor with anchor piles, and in the case of the closed box, a concrete roof structure. The contractor must calculate the hydraulic loads, document the results, and make recommendations for the structural execution. The procedure is a negotiated procedure without prior publication, meaning the contracting authority negotiates directly with selected suppliers. The assignment requires in-depth knowledge of hydraulic modeling, structural analysis, and the relevant Dutch laws and regulations in the field of hydraulic engineering.

Services · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Services
Onderhandeling zonder bekendmaking
Estimated value
€129,400
awarded value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tenderhydraulic design loadVerdiepte Liggingopen box construction

01What is being requested

The assignment from Rijkswaterstaat concerns determining the governing hydraulic design load for the Depressed Alignment in the ViA15 project. An analysis is requested for four sub-components: an open box construction, a closed box construction, a PVC foil construction, and a dive-under. All constructions include sheet piles with tension anchors, an underwater concrete and construction floor with anchor piles, and in the case of the closed box, a concrete roof structure. The contractor must calculate the hydraulic loads, document the results, and make recommendations for the structural execution. The procedure is a negotiated procedure without prior publication, meaning the contracting authority negotiates directly with selected suppliers. The assignment requires in-depth knowledge of hydraulic modeling, structural analysis, and the relevant Dutch laws and regulations in the field of hydraulic engineering.

The assignment focuses on deriving the governing hydraulic design load for the Depressed Alignment in the ViA15. The system of the Depressed Alignment consists of the following four sub-components: 1. An open box construction. Consisting of sheet piles with tension anchors in combination with an underwater concrete and construction floor containing anchor piles as foundation. 2. A closed box construction. Structurally identical to the configuration mentioned in point 1, but locally closed over approximately 140 meters by means of a concrete roof structure. 3. A foil construction. Consis

71335000Services

02Outcome

Awarded

STICHTING DELTARES

Award value
€129,400

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Witteveen+Bos Raadgevende ingenieurs B.V.SME9788×
2Arcadis Nederland B.V.SME96151×
3Haskoning Nederland B.V.SME96129×
4Sweco Nederland B.V. SME9695×
5Antea Nederland BVSME9577×
6Movares Nederland B.V.SME9466×

06Legal themes that may be relevant here

07Frequently asked questions

What is the specific content of the assignment for the ViA15 Groundwater Dossier?
The assignment concerns determining the governing hydraulic design load for the Depressed Alignment in the ViA15 project.
Which sub-components does the Depressed Alignment system consist of?
The system consists of four sub-components: an open box construction, a closed box construction, a foil construction (PVC foil of approx. 1 mm thickness), and a dive-under.
Which structural elements are part of the open and closed box construction?
These constructions consist of sheet piles with tension anchors in combination with an underwater concrete and construction floor containing anchor piles as foundation. The closed box construction is locally closed over approximately 140 meters by means of a concrete roof structure.
What is the composition of the foil construction within this dossier?
The foil construction consists of a PVC foil with a thickness of approximately 1 mm.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713