31179746 - Van Brienenoordbrug New Construction follow-up
Rijkswaterstaat is requesting a specialized service provider to provide the calculations and designs for the replacement of the Van Brienenoordbrug. A new West Arch must be designed, the old West Arch renovated to replace the existing East Arch, and the existing substructure – a caisson from 1960 combined with a pier foundation from 1990 – must be recalculated. The assignment is non-standard because the bridge must be designed under many restrictive constraints and the standards for the reuse of existing bridges are often unclear or insufficient. The recalculation of the substructure falls outside regular standards, requiring a highly complex analysis. The contracting authority expects a complete technical dossier, including structural calculations, design drawings, and a risk analysis, that complies with the requirements of Rijkswaterstaat and the relevant laws and regulations.
Services · Onderhandeling zonder bekendmaking · European procedure
01What is being requested
Rijkswaterstaat is requesting a specialized service provider to provide the calculations and designs for the replacement of the Van Brienenoordbrug. A new West Arch must be designed, the old West Arch renovated to replace the existing East Arch, and the existing substructure – a caisson from 1960 combined with a pier foundation from 1990 – must be recalculated. The assignment is non-standard because the bridge must be designed under many restrictive constraints and the standards for the reuse of existing bridges are often unclear or insufficient. The recalculation of the substructure falls outside regular standards, requiring a highly complex analysis. The contracting authority expects a complete technical dossier, including structural calculations, design drawings, and a risk analysis, that complies with the requirements of Rijkswaterstaat and the relevant laws and regulations.
For the replacement of the existing Van Brienenoordbrug, calculations and designs will be created for a new West Arch, the renovation of the old West Arch to replace the existing East Arch, and the recalculation of the existing substructure. Both arch designs are non-standard due to the many restrictive constraints within which the design must be developed, and the fact that standards are often unclear or insufficient in the case of reusing an existing bridge. The existing substructure is a composite structure consisting of a caisson (built around 1960) and a pier foundation (built in 1990); t
02Outcome
TNO
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What is the specific content of the assignment for the Van Brienenoordbrug?
Why is the recalculation of the bridge's substructure complex?
What are the challenges in designing the new arches?
What must the final technical dossier of the assignment contain?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 341K
€ 992K
€ 6,5 mln
Gegunde waarden in CPV 71 · diensten n=2713