31179746 - Van Brienenoordbrug New Construction follow-up

Rijkswaterstaat Water, Verkeer en Leefomgeving · Onderhandeling zonder bekendmaking · 1 lots · 301004
Type
Services
71335000
Estimated value
€ 219K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat is requesting a specialized service provider to provide the calculations and designs for the replacement of the Van Brienenoordbrug. A new West Arch must be designed, the old West Arch renovated to replace the existing East Arch, and the existing substructure – a caisson from 1960 combined with a pier foundation from 1990 – must be recalculated. The assignment is non-standard because the bridge must be designed under many restrictive constraints and the standards for the reuse of existing bridges are often unclear or insufficient. The recalculation of the substructure falls outside regular standards, requiring a highly complex analysis. The contracting authority expects a complete technical dossier, including structural calculations, design drawings, and a risk analysis, that complies with the requirements of Rijkswaterstaat and the relevant laws and regulations.

Services · Onderhandeling zonder bekendmaking · European procedure

European
Contract type
Services
Onderhandeling zonder bekendmaking
Estimated value
€219,000
estimated value
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Lelystad
CharacteristicsCPV 71ServicesEU tenderVan BrienenoordbrugWestboogcaisson

01What is being requested

Rijkswaterstaat is requesting a specialized service provider to provide the calculations and designs for the replacement of the Van Brienenoordbrug. A new West Arch must be designed, the old West Arch renovated to replace the existing East Arch, and the existing substructure – a caisson from 1960 combined with a pier foundation from 1990 – must be recalculated. The assignment is non-standard because the bridge must be designed under many restrictive constraints and the standards for the reuse of existing bridges are often unclear or insufficient. The recalculation of the substructure falls outside regular standards, requiring a highly complex analysis. The contracting authority expects a complete technical dossier, including structural calculations, design drawings, and a risk analysis, that complies with the requirements of Rijkswaterstaat and the relevant laws and regulations.

For the replacement of the existing Van Brienenoordbrug, calculations and designs will be created for a new West Arch, the renovation of the old West Arch to replace the existing East Arch, and the recalculation of the existing substructure. Both arch designs are non-standard due to the many restrictive constraints within which the design must be developed, and the fact that standards are often unclear or insufficient in the case of reusing an existing bridge. The existing substructure is a composite structure consisting of a caisson (built around 1960) and a pier foundation (built in 1990); t

71335000€ 219KServices
1Lot 1

02Outcome

Awarded

TNO

Award value
€219,000
vs. estimate
0%

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

€219,000

05Bidders in this segment

#Likely bidderFitWins
1Arcadis Nederland B.V.SME100151×
2Haskoning Nederland B.V.SME100129×
3Witteveen+Bos Raadgevende ingenieurs B.V.SME10088×
4Movares Nederland B.V.SME10066×
5Sweco Nederland B.V. SME9995×
6Antea Nederland BVSME9977×

06Legal themes that may be relevant here

07Frequently asked questions

What is the specific content of the assignment for the Van Brienenoordbrug?
The assignment includes performing calculations and designs for a new West Arch, renovating the old West Arch to replace the existing East Arch, and recalculating the existing substructure.
Why is the recalculation of the bridge's substructure complex?
The existing substructure is a composite of a caisson from circa 1960 and a pier foundation from 1990. The recalculation of this does not fall within regular standards, which requires a highly complex analysis.
What are the challenges in designing the new arches?
The designs of the arches are not standard work due to the many restrictive constraints and the fact that standards for the reuse of an existing bridge are often unclear or insufficient.
What must the final technical dossier of the assignment contain?
The dossier must provide structural calculations, design drawings, and a risk analysis that comply with the requirements of the contracting authority and the relevant laws and regulations.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
€ 219K

Gegunde waarden in CPV 71 · diensten n=2713