ClosedWorksOpenGreen

31171614: Market Consultation Road Markings Innova58

Type
Works
45233221
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat (RWS) is launching a market consultation (tender 31171614) to explore innovative, sustainable road markings. The consultation focuses on testing 12 new road marking elements within the Innova58 innovation strip. The procurement is open and intended to collect ideas and concepts that improve long-term sustainability, safety, visibility, and maintenance costs. The test results will serve as a basis for future implementation in the Dutch road network. The market consultation requires a structured approach, in which suppliers must present their concepts, technical specifications, test plans, and evaluation criteria. RWS expects a multidisciplinary approach that takes into account material innovation, production processes, installation, and service life.

Works · Open · National procedure

Sustainability counts
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45WorksGreen / SPProad markingssustainabilityinnovation

01What is being requested

Rijkswaterstaat (RWS) is launching a market consultation (tender 31171614) to explore innovative, sustainable road markings. The consultation focuses on testing 12 new road marking elements within the Innova58 innovation strip. The procurement is open and intended to collect ideas and concepts that improve long-term sustainability, safety, visibility, and maintenance costs. The test results will serve as a basis for future implementation in the Dutch road network. The market consultation requires a structured approach, in which suppliers must present their concepts, technical specifications, test plans, and evaluation criteria. RWS expects a multidisciplinary approach that takes into account material innovation, production processes, installation, and service life.

This market consultation serves to anchor new ideas and concepts regarding, among other things, long-term sustainability. Therefore, in 2022, RWS made the innovation strip available to test and assess approximately 12 road markings on various aspects. Please refer to the market consultation document.

45233221Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Gebr. van Kessel Wegenbouw B.V.SME9820×
2BAM Infra B.V.SME9677×
3Boskalis Nederland B.V.SME9669×
4Heijmans Infra B.V.SME9665×
5Dura Vermeer Infra Regionale Projecten BVSME9658×
6De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9626×

04Tender documents

31171614 Concept Overeenkomst testen wegmarkeringen v1.1pdfNov 4, 2021 · 617 KB
Bijlage D - Eisen Markering 2021 v4pdfNov 4, 2021 · 1800 KB
Oplegvel aanpassingen Oproep en Overeenkomst WegmarkeringenpdfNov 4, 2021 · 199 KB
Oproep wegmarkering v1.1pdfNov 4, 2021 · 1068 KB
Uniform Europees Aanbestedingsdocument (UEA)pdfNov 4, 2021 · 304 KB
Format productvoorstel Wegmarkeringen v1.1.docxpdfNov 4, 2021 · 464 KB
Bijlage A - Concept Overeenkomst testen wegmarkeringen v1.0pdfOct 21, 2021 · 615 KB
Uniform Europees Aanbestedingsdocument (UEA)pdfOct 21, 2021 · 304 KB
Bijlage D - Eisen Markering 2021 v4pdfOct 21, 2021 · 1800 KB
TN321625 - SF01 Vooraankondiging 20211021105034pdfOct 21, 2021 · 17 KB
Bijlage C - Verkorte uitleg MKIpdfOct 21, 2021 · 762 KB
Bijlage B - Format productvoorstel Wegmarkeringen v1.0pdfOct 21, 2021 · 315 KB

05Legal themes that may be relevant here

06Frequently asked questions

What specifically is being tested within the innovation strip?
Within the innovation strip, approximately 12 road markings are being tested and assessed on various aspects.
On which aspects are the road markings assessed?
The road markings are assessed on aspects such as long-term sustainability, safety, visibility, and maintenance costs.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159