31146467: Announcement of a modification Design and replacement of Hoog Burel viaduct
Rijkswaterstaat is requesting a full replacement of the Hoog Burel viaduct (object 33A-109-01) west of Apeldoorn, over the A1. The structure is located within a Natura 2000 area, meaning environmental requirements play a crucial role. The new construction must be suitable for all traffic classes, comply with the already established client and safety standards, and guarantee a service life of 100 years. The project includes abutments, piers, a complete deck and railings, and requires integration into the A1 system with attention to the aesthetic program of requirements (EPvE) and the applicable road design guidelines. The procedure is negotiations without publication, which means limited competition.
Works · Onderhandeling zonder bekendmaking · National procedure
01What is being requested
Rijkswaterstaat is requesting a full replacement of the Hoog Burel viaduct (object 33A-109-01) west of Apeldoorn, over the A1. The structure is located within a Natura 2000 area, meaning environmental requirements play a crucial role. The new construction must be suitable for all traffic classes, comply with the already established client and safety standards, and guarantee a service life of 100 years. The project includes abutments, piers, a complete deck and railings, and requires integration into the A1 system with attention to the aesthetic program of requirements (EPvE) and the applicable road design guidelines. The procedure is negotiations without publication, which means limited competition.
This concerns the Hoog Burel viaduct – object 33A-109-01, located west of Apeldoorn and running over Rijksweg A1. The object is located in a Natura 2000 area. The project provides for the total replacement of the existing structure so that a new connection is available that: * is suitable for all traffic classes; * complies with the client requirements already gathered; * is reliable, available, maintainable, and safe for a period of 100 years. It concerns the overall new construction of the viaduct: abutments, piers and (complete) deck, including railings. Furthermore, the necessary measures
02Outcome
Dura Vermeer Divisie Infra BV
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the works for the Hoog Burel viaduct?
What technical requirements must the new construction meet?
Which specific guidelines apply to the integration of the viaduct?
Which environmental conditions are important for this project?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159