31146467: Announcement of a change to the design and replacement of Hoog Burel viaduct

Rijkswaterstaat Programma's, Projecten en Onderhoud · Onderhandeling zonder bekendmaking · 1 lots · 267859
Type
Works
45221121
Estimated value
€ 885K
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat has announced a change to the design and replacement of the Hoog Burel viaduct (object 33A-109-01) on the A1 west of Apeldoorn. The existing structure, located within a Natura 2000 area, must be fully replaced by a new viaduct that is suitable for all traffic classes, meets the collected customer requirements, and guarantees a service life of 100 years. The works include the construction of abutments, piers, a complete deck including railings, and the integration of the new viaduct into the existing A1 system. Explicit attention is requested for the A1 aesthetic program of requirements (EPvE) and current laws and regulations regarding road design. The procedure is a negotiated procedure without publication, meaning only selected parties can participate.

Works · Onderhandeling zonder bekendmaking · National procedure

Contract type
Works
Onderhandeling zonder bekendmaking
Estimated value
€885,000
estimated value
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Utrecht
CharacteristicsCPV 45Worksviaduct replacementNatura 2000A1 motorway

01What is being requested

Rijkswaterstaat has announced a change to the design and replacement of the Hoog Burel viaduct (object 33A-109-01) on the A1 west of Apeldoorn. The existing structure, located within a Natura 2000 area, must be fully replaced by a new viaduct that is suitable for all traffic classes, meets the collected customer requirements, and guarantees a service life of 100 years. The works include the construction of abutments, piers, a complete deck including railings, and the integration of the new viaduct into the existing A1 system. Explicit attention is requested for the A1 aesthetic program of requirements (EPvE) and current laws and regulations regarding road design. The procedure is a negotiated procedure without publication, meaning only selected parties can participate.

This concerns the Hoog Burel viaduct – object 33A-109-01, located west of Apeldoorn and running over Rijksweg A1. The object is located in a Natura 2000 area. The project provides for the complete replacement of the existing structure so that a new connection is available that: * is suitable for all traffic classes; * meets the customer requirements already collected; * is reliable, available, maintainable, and safe for a period of 100 years. It concerns the overall new construction of the viaduct: abutments, piers, and (complete) deck, including railings. Furthermore, the necessary measures m

45221121€ 885KWorks
1Lot 1

02Outcome

Awarded

Dura Vermeer Divisie Infra BV

Award value
€885,000
vs. estimate
0%

03Value in context

€885,000

04Bidders in this segment

#Likely bidderFitWins
1BAM Infra B.V.SME10077×
2Heijmans Infra B.V.SME9965×
3Boskalis Nederland B.V.SME9869×
4KWS Infra B.V.SME9792×
5Combinatie Heijmans - SWARCOUnknown9673×
6Dura Vermeer Infra Regionale Projecten BVSME9658×

05Legal themes that may be relevant here

06Frequently asked questions

What is the exact scope of the works for the Hoog Burel viaduct?
The assignment concerns the overall new construction of the viaduct (object 33A-109-01), including the abutments, piers, the complete deck, and the railings. Additionally, measures must be taken to integrate the viaduct into the A1 system.
What technical requirements must the new viaduct meet?
The new structure must be suitable for all traffic classes, meet the customer requirements already collected, and be reliable, available, maintainable, and safe for a period of 100 years.
Which specific guidelines apply to the design of the viaduct?
When integrating into the A1 system, account must be taken of the A1 aesthetic program of requirements (EPvE) and the current laws and regulations for road design.
In what environment is the project being carried out?
The Hoog Burel viaduct is located in a Natura 2000 area.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 885K

Gegunde waarden in CPV 45 · werken n=3159