270.19.01.RE Maintenance Tunnel Houtenhoek
Maintenance works on the Tunnel Houtenhoek on the N270, including concrete repair, asphalt work, and road markings, with a completion date no later than 1 December 2026.
Works · Open · National procedure
01What is being requested
The work concerns the maintenance of the Tunnel Houtenhoek on the N270 between km. 23.915 and 24.295 in the municipality of Deurne. The activities include, among other things, clearing works, repairing joints in the tunnel floor, applying asphalt paving and markings, and various maintenance measures. The maintenance period for concrete repair work is 6 months.
Tunnel Houtenhoek is located on the provincial road between Helmond and Deurne. The tunnel is located under the Bakelseweg in Deurne. Since 2020, various asphalt damages have occurred in the tunnel. Since 2022, investigations have been conducted into the technical condition of the tunnel, with the aim of determining the cause of the asphalt damage.
02Strategic insight
Ensure strict compliance with the CUR-Aanbeveling 118 during concrete repairs to meet the requirement of 30 years of maintenance-free concrete. Incorporate the costs for the mandatory Ibis Besteksadministratie licenses and their use directly into the item 'Uitvoeringskosten'. Take into account the strict penalty for exceeding the completion date through a daily reduction of € 1,000.00.
03Points of attention
04Can I take part?
05Value in context
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159