264.39.01.RE | Odiliapeel and Haps | Major maintenance sub-areas 1, 2 and 3 and implementation of safety measures sub-area 2 and 3
The document contains the results of an exploratory soil and waterbed investigation for the N264 in Odiliapeel and St. Hubert, performed by TAUW.
Works · Open · European procedure
01What is being requested
This report describes the performed exploratory (water) soil investigation including asbestos on the N264 in Odiliapeel - St. Hubert for sub-area 2, 3a and 3b.
To address the issues regarding traffic flow, livability, and traffic safety on the provincial road, the province of Noord-Brabant plans to perform major maintenance on the main carriageway of the N264 between kilometer 31,500 and kilometer 43,000. The goal is to ensure the technical and traffic engineering functionality of this road for at least 10 years. The maintenance will primarily focus on the main carriageway, where the entire surface course will be replaced by a new layer of asphalt. Additionally, specific safety measures will be implemented between kilometer 35,200 and kilometer 43,00
02Strategic insight
Take into account the suspect locations such as the verges and dams when executing the works. Pay specific attention to the presence of asbestos and mineral oil in the soil. Check the PFAS restrictions for application in groundwater protection areas.
03Points of attention
04Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
05Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
06Likely competitors
07Tender documents
08Legal themes that may be relevant here
09Frequently asked questions
What is the purpose of the works on the N264?
What specific works are being carried out on the road surface?
Where are the safety measures being implemented?
What is the scope of the major maintenance on the main carriageway?
Automatically compiled from the official tender data and documents.