ClosedWorksRestricted

25081|Repair of water mist installation - New fire safety concept courthouse in Zwolle

Rijksvastgoedbedrijf · Restricted · 364708
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This tender concerns the realization of a new fire safety concept for the courthouse in Zwolle, including adjustments to the water mist installation. The procedure starts with an application phase in which a maximum of five candidates will be selected based on technical and professional suitability.

Works · Restricted · National procedure

Complete timeline
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
National
National procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Works

01What is being requested

The elaboration of the new fire safety concept based on the VO-design and the realization of the associated works for the Rechtbank Zwolle for a maximum of 30 months.

The courthouse in Zwolle (hereinafter referred to as rechtbank Zwolle) is a property consisting of an old building part “Krugergebouw” (1967, renovated in 2016) and a new building part “Hootsmansgebouw” (2013). It is a landmark complex where new and existing parts are carefully coordinated and interconnected. An important part of the current fire safety concept of the court is the water mist installation. In recent years, problems have occurred within the installation, including corrosion in installation parts resulting in leakage. Currently, certain parts of the installation have been discon

45000000Works

02Strategic insight

Strategic insight · AI analysis
Ensure conclusive supporting documents such as satisfaction statements or contract pages for the technical reference assignments. Note the maximum length of 3 pages for the motivation regarding complex realization tasks when reviewing selection criteria. Check whether the reference period for each specific core competence is correctly applied.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The works must minimize disruption to the primary process of the users.Important
If involved in the preparation phase, a conflict of interest protection plan must be submitted.Important
For participation, an Eigen Verklaring Sancties Rusland must be submitted.Important
Project documents or project sheets are not accepted as evidence for reference assignments.Important
The agreement is based on the UAV-GC 2025.Important

04Can I take part?

Technical · 4
Experience with Integrated Contract Forms: one reference assignment based on UAV-GC or equivalent, utility construction with at least 2,000 m2 GFA, level of Execution-ready Design or specification accepted no later than 7 years ago.Technical
Experience with water mist installations: one reference assignment concerning new construction, repair or replacement in a utility building, includes completed Final Design, GFA at least 2,000 m2, level of Execution-ready Design or specification accepted no later than 5 years ago.Technical
Experience with renovation projects in secured business environments: one reference assignment in an existing secured environment with multiple security layers, GFA at least 2,000 m2, responsible as main contractor, level of Execution-ready Design or specification accepted no later than 5 years ago.Technical
Experience with coordination of engineering works: one reference assignment concerning coordination of installation technology in a utility building within an operational business environment, at least phase of Detailed Design or specification, GFA at least 2,000 m2, level of Execution-ready Design or specification accepted no later than 5 years ago.Technical
Professional capability · 1
Quality management system: one of the combined parties must have a valid ISO 9001 certificate with scope of design in utility construction.Professional capability

05Process & timeline

Information meeting application phase
14 maart 2025
Deadline for submitting requests for further information application phase
20 maart 2025
Publication of Notice of Information application phase
25 maart 2025
Closing date for submitting application
2 april 2025
Notification of selection decision & appeal period
24 april 2025
Sending invitation to tender
6 mei 2025

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

07Likely competitors

#Likely bidderFitWins
1Heijmans Utiliteit B.V.SME9327×
2Hegeman Bouw & Infra B.V.SME9131×
3BAM Bouw en Techniek bvSME9134×
4BINX Smartility B.V.SME8927×
5Croonwolter&dros B.V.SME8925×
6Unica Installatietechniek B.V.SME8913×

08Tender documents

TN505566 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251209135845pdfDec 9, 2025 · 11 KB
Annexen UAV-GC 2025 v 0.2pdfMar 25, 2025 · 314 KB
Basisovereenkomst UAV-GC 2025 v 0.2pdfMar 25, 2025 · 239 KB
Nota van inlichtingen 2025-03-20-1pdfMar 20, 2025 · 10 KB
25081 PV inlichtingenbijeenkomstpdfMar 20, 2025 · 142 KB
TN505566 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250211172912pdfFeb 11, 2025 · 11 KB
Model Geheimhoudingsverklaring (versie 8 november 2021)pdfFeb 10, 2025 · 163 KB
Verklaring bestuurder Model KpdfFeb 10, 2025 · 206 KB
Inschrijvingsbiljet combinatiespdfFeb 10, 2025 · 207 KB
InschrijvingsbiljetpdfFeb 10, 2025 · 205 KB
uea_505566_20250207101818pdfFeb 10, 2025 · 1669 KB
25081 Aanbestedingsleidraad inschrijvingsfasepdfFeb 10, 2025 · 254 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the core of the assignment for the water mist installation in the courthouse in Zwolle?
The assignment concerns the repair of the water mist installation within a new fire safety concept. This concept is based on a risk-based approach in accordance with NEN 6079 and includes the addition of structural fire-resistant provisions, whereby the existing water mist installation is partially maintained.
What is the reason for the works on the water mist installation?
In recent years, problems have occurred in the installation, including corrosion in installation parts which has led to leakages. As a result, certain parts of the current installation are currently disconnected.
In what manner is the new fire safety concept laid down?
The new fire safety concept is laid down in an Integraal Plan Brandbeveiliging (IPB), using a risk-based approach in accordance with NEN 6079.
Which regulation applies regarding conflicts of interest in this tender?
For this tender, the Regeling Scheiding van belang Rijksvastgoedbedrijf 16.1 (RSBR 16.1 - July 2016) applies. This regulation contains guidelines for countering conflicts of interest and ensuring the quality of competition.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159