OpenServicesEuropeanRestricted

23234 | Project management and supervision expansion of power supply FPC de Oostvaarderskliniek in Almere

Rijksvastgoedbedrijf · Restricted · 1 lots · 427199
Type
Services
71247000 · Supervision of constru
Estimated value
Not published
To deadline
12d
Jul 2, 2026 · 07:00
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
1 criteria
Assess manuallyconfidence high

This tender concerns the project management and supervision for the expansion of the power supply at FPC de Oostvaarderskliniek in Almere. The contract will be awarded on the basis of the lowest price.

Services · Restricted · European procedure

EuropeanComplete timeline
Contracting authority
Rijksvastgoedbedrijf
Flevoland
Contract type
Services
Restricted
Estimated value
Estimate not published
Submission deadline
July 2, 2026
07:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Supervision of construction works
Location
Almere, Flevoland
CharacteristicsCPV 71ServicesEU tenderDirectievoeringToezichthouderToezicht

01What is being requested

Project management and supervision for the expansion of the power supply of FPC de Oostvaarderskliniek in Almere. The assignment will be carried out by a selected candidate via a European non-open procedure.

De Oostvaarderskliniek in Almere is a forensic psychiatric center (FPC). Focused on the safety of society, FPC de Oostvaarderskliniek (OVK) treats patients with demonstrably risky behavior, both clinically and outpatients. In addition to patients with a tbs-measure, the clinic also focuses on patients with a different legal title. The treatment, carried out by FPC de Oostvaarderskliniek, leads to a reduction in the risky behavior of patients, whereby the tbs-clinic makes a demonstrable contribution to the safety of society. The current energy supply of the clinic has reached its limit. The cu

71247000Services
123234 | Project management and supervision expansion of power supply FPC de Oostvaarderskliniek in Almere

02Strategic insight

Strategic insight · AI analysis
Focus on the lowest tender sum, as this is the only award criterion. Ensure complete and correct signing of the tender form and the tender budget by the correct authorized persons in accordance with the Commercial Register to prevent invalidity. Take into account the strict remedy period of two working days in case of any questions regarding the completeness of the documents.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
Site visit: Registration for the visit must take place no later than 28 August 2026 via the TenderNed messaging module.Important
Participants visit: A maximum of 3 persons per selected candidate may participate in the visit.Important
Visit restrictions: It is not permitted to take photos and videos during the visit; bringing mobile phones, tablets, laptops and/or cameras is not allowed.Important
Signing: Documents must be signed by the authorized representative(s) as registered in the Commercial Register (for example, the directors).Important
Remedy period: If defects are identified in the tender, remedy must take place within two working days after the request for remedy.Important
Equal tender: If there are equal economically most advantageous tenders, the winner will be determined by lottery.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Award criteria

Lowest priceweight n/a

The most economically advantageous tender is determined on the basis of the lowest price. The price criterion consists of the tender sum as filled in on the tender form.

06Process & timeline

Site visit
Week 36 of 37
Deadline for submitting requests for further information
14 september 2026
Publication of Memorandum of Information
21 september 2026
Closing date for submitting tenders
2 oktober 2026, 09.00 uur
Notification of award decision & appeal period
8 oktober 2026
Award of contract & signing agreement
29 oktober 2026

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

08Likely competitors

#Likely bidderFitWins
1Antea Nederland BVSME9777×
2Arcadis Nederland B.V.SME94151×
3Haskoning Nederland B.V.SME94129×
4Sweco Nederland B.V. SME9495×
5Witteveen+Bos Raadgevende ingenieurs B.V.SME9488×
6Tauw bvSME9452×

09Tender documents

DNR 2011pdfJun 2, 2026 · 171 KB
ABAA DNR 2011pdfJun 2, 2026 · 148 KB
23234 Regeling Scheiding van belang Rijksvastgoedbedrijf 16.1 (RSBR 16.1)pdfJun 2, 2026 · 352 KB
23234 Eigen Verklaring Sancties RuslandpdfJun 2, 2026 · 193 KB
BOAL230121.05.PM.TDL.0001-DpdfJun 2, 2026 · 125 KB
2017.01 Huisregels FPC de OostvaarderskliniekpdfJun 2, 2026 · 105 KB
23234 Model opgave referentieopdrachtenpdfJun 2, 2026 · 255 KB
23234 GeheimhoudingsverklaringpdfJun 2, 2026 · 68 KB
23234 Bijlage 2 kruisjeslijst STB 2014 directievoering en toezichtxlsxJun 2, 2026 · 718 KB
23234 ABAA DNR 2011 Bijlage 1 opdachtomschrijvingpdfJun 2, 2026 · 1332 KB
23234 ABAA DNR 2011 Basisovereenkomst conceptpdfJun 2, 2026 · 349 KB
23234 Aanbestedingsleidraad inschrijvingsfase Directievoering en toezicht OVKpdfJun 2, 2026 · 365 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the specific assignment for the power supply at FPC de Oostvaarderskliniek?
The assignment includes the project management and supervision of the building and installation technical works for the complete replacement of the current power supply.
Why must the power supply of the clinic in Almere be replaced?
The current transformer and distributor are under maximum load and the installation no longer meets the latest requirements of the Dienst Justitiële Inrichtingen (DJI).
Which legal regulation applies to the legal relationship?
The assignment falls under the DNR 2011 (De Nieuwe Regeling 2011), the revised version of the DNR 2005 for the legal relationship between the contracting authority and the advisor.
Which tasks fall under the initiative/feasibility phase?
Tasks such as drafting policy principles for the project and making decisions about phase results and progress fall under this phase.

Automatically compiled from the official tender data and documents.

12Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713