2025-059 Realisation of the New Lingebrug (construction team)

Gemeente Gorinchem · Open · 1 lots · 412152
Type
Works
45220000 · Civil engineering and
Estimated value
Not published
To deadline
-56d
Apr 20, 2026 · 12:00
Knock-outs
1
exclusion grounds
Award basis
Best price-quality ratio
4 criteria
Assess manuallyconfidence high

Tender for the realisation of the New Lingebrug via a construction team arrangement, consisting of an advisory phase and a realisation phase. The focus lies on manufacturability, construction logistics, and minimizing nuisance during construction.

Works · Open · European procedure

European1 exclusion groundsComplete timeline
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
April 20, 2026
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Civil engineering and building works
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realisation of the New Lingebrug including approaches and optionally the cut in the Arkelsedijk. The assignment is set up as a construction team arrangement where the contractor fulfills an advisory role in phase A and is responsible for the execution design and the realisation of the fixed concrete bridge in phase B.

The work concerns the realisation of the 'new Lingebrug' including abutments and associated works. The municipality wishes to elaborate the VO (Preliminary Design) into a feasible DO (Definitive Design) within a construction team framework. During the construction team phase, the scope of the assignment will also be further detailed.

45220000Works
12025-059 Realisation of the New Lingebrug (construction team)

02Strategic insight

Strategic insight · AI analysis
Focus strongly on the advisory role in phase A, as expertise in construction phasing, logistics, and methodology is essential for the transition from VO+ to DO. Ensure an integrated approach where collaboration within the construction team and feasibility are central to the qualitative substantiation. Strictly observe the communication regulations via TenderNed to prevent exclusion.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 6
The assignment is executed via a construction team agreement.Important
In phase A, the contractor has an advisory role in elaborating the VO+ into a DO.Important
The agreement for phase B will be based on the UAV-GC 2025.Important
The use of own general terms and conditions is not permitted and will lead to exclusion.Important
Communication with the contracting authority may only take place via TenderNed.Important
The bid has a standstill period of three months.Important

04Can I take part?

Financial · 1
Financial and economic standing (in accordance with chapter 4.4).Financial
Technical · 2
Technical ability, core competencies (in accordance with chapter 4.5).Technical
Technical ability, business certificates (in accordance with chapter 4.6).Technical
Professional capability · 1
Professional competence (in accordance with chapter 4.7).Professional capability
Exclusion ground · 1
Exclusion grounds (in accordance with chapter 4.1).Exclusion ground

05Exclusion grounds

Exclusion grounds (1)
  • Exclusion grounds (in accordance with chapter 4.1).

06Award criteria

K1. Feasibility and viability in Phase A and Bweight n/a

Assessment of the feasibility and viability during the construction team phase and the realisation phase.

K2. Collaboration within the construction teamweight n/a

Assessment of the collaboration within the construction team.

K3. Interviewweight n/a

Assessment based on an interview.

K0 Priceweight n/a

The price of the bid.

07Process & timeline

Deadline for registration for information meeting
Vrijdag 27 februari 12:00 uur
Information meeting
Dinsdag 3 maart 2026 13:00- 15:00 uur
Latest date and time for submitting questions regarding Note of Information 1
Maandag 16 maart 2026 om 12:00 uur
Publication of Note of Information 1
Maandag 23 maart 2026
Latest date and time for submitting questions regarding Note of Information 2
Maandag 30 maart 2026 om 12:00 uur
Publication of Note of Information 2
Maandag 6 april 2026
Latest receipt of bids
Maandag 20 april 2026 om 12:00 uur
Announcement of (provisional) award decision
Maandag 11 mei 2026
Final award of contract
Maandag 1 juni 2026

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

09Likely competitors

#Likely bidderFitWins
1BAM Infra B.V.SME10077×
2KWS Infra B.V.SME9692×
3Dura Vermeer Infra Regionale Projecten BVSME9658×
4Boskalis Nederland B.V.SME9669×
5Heijmans Infra B.V.SME9565×
6Van Gelder BVSME9553×

10Tender documents

TN555322 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20260213100536pdfFeb 15, 2026 · 140 KB
260213 AanbestedingsleidraadpdfFeb 13, 2026 · 693 KB
2025-059 Bijlage 12 - Toelichtend document OpdrachtgeverpdfFeb 13, 2026 · 70 KB
2025-059 Bijlage 7 - Concept BouwteamovereenkomstzipFeb 13, 2026 · 666 KB
2025-059 Bijlage 1 - Overzicht in te dienen documentenpdfFeb 13, 2026 · 59 KB
2025-059 Bijlage 10 - RisicodossierpdfFeb 13, 2026 · 62 KB
2025-059 Bijlage 8 - OntwerpdossierzipFeb 13, 2026 · 59603 KB
2025-059 Bijlage 09 - KlanteisenpdfFeb 13, 2026 · 79 KB
Bijlage 2 UEApdfFeb 6, 2026 · 339 KB
2025-059 Bijlage 4 - InschrijfformulierdocxFeb 6, 2026 · 714 KB
Bijlage 3-KC3 invulformulier referentiedocxFeb 6, 2026 · 15 KB
Bijlage 3-KC5 invulformulier referentiedocxFeb 6, 2026 · 15 KB

11Legal themes that may be relevant here

12Frequently asked questions

What is the specific assignment description for the realisation of the new Lingebrug?
The work includes the realisation of the new Lingebrug, including the abutments and associated works. During the construction team phase, the Preliminary Design (VO) is elaborated into a feasible Definitive Design (DO) and the scope of the assignment is further detailed.
Which suitability criteria must a construction team meet?
Bidders must possess recognized experience with civil engineering bridge constructions within the past 5 years. Additionally, a proven ability to collaborate with multiple stakeholders and to establish a construction team agreement is required, including compliance with guidelines EN 1991-2 and EN 1993-1-1.
Which mandatory documents and conditions apply to the bid?
Establishing a construction team arrangement in accordance with procurement rules is mandatory. Bidders must submit the complete mandatory document package, including the Social Return protocol.
What are the main points of attention during the construction team phase?
During the construction team phase, further detailing of the scope takes place. Account must be taken of possible scope changes, the complexity of the bridge construction, and the necessity to comply with Social Return requirements.

Automatically compiled from the official tender data and documents.