2022-10: Construction team Tidal Culvert Dubbele Dijk
The Province of Groningen and the Noorderzijlvest water board have established the Dubbele Dijk pilot project as part of the Eemshaven – Delfzijl dike reinforcement. The objective is to develop the area between the dikes without losing its water storage function, with an emphasis on silt trapping and nature development. To achieve this, a controlled structure – a tidal culvert – must be placed in the primary flood defense to allow saltwater from the Eems to flow into the inner area. The tender focuses on the further elaboration and realization of this tidal culvert in the Wadden Sea dike within a construction team, targeting the southern section. The procedure is public and the CPV code is not specified.
Works · Open · European procedure
01What is being requested
The Province of Groningen and the Noorderzijlvest water board have established the Dubbele Dijk pilot project as part of the Eemshaven – Delfzijl dike reinforcement. The objective is to develop the area between the dikes without losing its water storage function, with an emphasis on silt trapping and nature development. To achieve this, a controlled structure – a tidal culvert – must be placed in the primary flood defense to allow saltwater from the Eems to flow into the inner area. The tender focuses on the further elaboration and realization of this tidal culvert in the Wadden Sea dike within a construction team, targeting the southern section. The procedure is public and the CPV code is not specified.
The Province of Groningen, together with the Noorderzijlvest water board, has taken the initiative for the Dubbele Dijk pilot project as part of the Eemshaven - Delfzijl dike reinforcement. For the area between the dikes, possibilities were explored to further develop it without losing its function as a water storage area. For the southern area of the double dike, several objectives have been formulated, the most important being silt trapping and nature development. To realize these objectives, a facility must be provided to allow saltwater to flow (controlled) from the Eems into the inner are
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Tender documents
06Legal themes that may be relevant here
07Frequently asked questions
What is the objective of the Dubbele Dijk pilot project?
What is the specific assignment of this tender?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln