2022-03-DJ-New Construction Sportaal B.V. Swimming Pool
The Municipality of Enschede has issued a non-public tender for the new construction of the Sportaal B.V. Swimming Pool. The project concerns a completely new sports and recreation complex including a swimming pool, training rooms, changing rooms, a catering facility, and a small-scale grandstand. The contracting authority expects an integrated approach in which design, engineering, construction, and delivery are established in a single contract. The tender requires strict compliance with Dutch building and safety standards, including accessibility for persons with disabilities, fire safety, energy efficiency, and environmental protection. The contractor must provide a detailed project plan, schedule, cost estimate, quality and risk management plan, and a maintenance plan for the first years of operation. The contractor is expected to have demonstrable experience with similar sports facilities, be financially stable, and meet the requirements of public procurement law. The tender is aimed at attracting a small or medium-sized enterprise (SME) with the capacity to realize a complex construction project worth several million euros.
Works · Restricted · European procedure
01What is being requested
The Municipality of Enschede has issued a non-public tender for the new construction of the Sportaal B.V. Swimming Pool. The project concerns a completely new sports and recreation complex including a swimming pool, training rooms, changing rooms, a catering facility, and a small-scale grandstand. The contracting authority expects an integrated approach in which design, engineering, construction, and delivery are established in a single contract. The tender requires strict compliance with Dutch building and safety standards, including accessibility for persons with disabilities, fire safety, energy efficiency, and environmental protection. The contractor must provide a detailed project plan, schedule, cost estimate, quality and risk management plan, and a maintenance plan for the first years of operation. The contractor is expected to have demonstrable experience with similar sports facilities, be financially stable, and meet the requirements of public procurement law. The tender is aimed at attracting a small or medium-sized enterprise (SME) with the capacity to realize a complex construction project worth several million euros.
New Construction Sportaal B.V. Swimming Pool
02Breakdown by lot
Per-lot values not published — bars show only the lot breakdown.
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
05Likely competitors
06Legal themes that may be relevant here
07Frequently asked questions
What does the assignment for the new construction of Sportaal B.V. Swimming Pool entail?
What approach is expected in the execution of this project?
What documentation must the contractor provide?
Which technical requirements must the building meet?
Automatically compiled from the official tender data and documents.
08Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln