AwardedWorksEuropeanRestricted

17506 | Implementation phase transformation building part H Gerechtsgebouw in Utrecht

Rijksvastgoedbedrijf · Restricted · 264909
Type
Works
45000000
Estimated value
€ 11M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Rijksvastgoedbedrijf (RVB) is seeking a main contractor for the implementation phase of the transformation of building part H of the Gerechtsgebouw in Utrecht. The project includes the full realization and coordination of the works, including structural demolition, building works, construction, fire safety, security, electrical engineering, mechanical engineering, data, facade and roof restoration, floor repair, painting, finishing carpentry, interior construction, commercial kitchen installation, studio space (in collaboration with a third party), and grounds works. The main contractor must manage a multidisciplinary team, ensure coordination between the various disciplines, and guarantee quality, safety, and regulatory compliance. Exceptions include the demolition of the fit-out package, delivery of loose furniture and planting, and the studio fit-out. The project is non-public and requires an experienced contractor with knowledge of (re)construction projects in a judicial or historical building.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
€11,187,700
awarded value
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tendergerechtsgebouwtransformatiehoofdaanneming

01What is being requested

The Rijksvastgoedbedrijf (RVB) is seeking a main contractor for the implementation phase of the transformation of building part H of the Gerechtsgebouw in Utrecht. The project includes the full realization and coordination of the works, including structural demolition, building works, construction, fire safety, security, electrical engineering, mechanical engineering, data, facade and roof restoration, floor repair, painting, finishing carpentry, interior construction, commercial kitchen installation, studio space (in collaboration with a third party), and grounds works. The main contractor must manage a multidisciplinary team, ensure coordination between the various disciplines, and guarantee quality, safety, and regulatory compliance. Exceptions include the demolition of the fit-out package, delivery of loose furniture and planting, and the studio fit-out. The project is non-public and requires an experienced contractor with knowledge of (re)construction projects in a judicial or historical building.

The main assignment consists of the realization and coordination of the entire Works under a main contract. The disciplines that must be represented in the implementation team concern: |n- implementation coordination;|n- structural demolition, building works, construction, fire safety, security;|n- electrical engineering, mechanical engineering, and data; |n- facade and roof restoration, restorative repair of floors, interior and exterior painting, finishing carpentry;|n- interior construction, commercial kitchen installation, studio space (in collaboration with a third party);|n- grounds wo

45000000Works

02Outcome

Awarded

J.P. van Eesteren B.V.

Award value
€11,187,700

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME10031×
2Heijmans Utiliteit B.V.SME10027×
3KWS Infra B.V.SME9792×
4BAM Bouw en Techniek bvSME9734×
5BAM Infra B.V.SME9677×
6BINX Smartility B.V.SME9627×

06Frequently asked questions

What does the main assignment of the transformation of building part H include?
The assignment concerns the realization and coordination of the entire works under a main contract. This includes disciplines such as implementation coordination, structural demolition, building works, construction, fire safety, security, electrical engineering, mechanical engineering, data, facade and roof restoration, floor repair, painting, finishing carpentry, interior construction, commercial kitchen installation, studio space, and grounds works.
Which works are not part of the assignment?
The demolition of the fit-out package and installation components, the delivery of loose furniture and planting, as well as the studio fit-out and furnishing, do not form part of the works.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 11 mln

Gegunde waarden in CPV 45 · werken n=3159