AwardedWorksEuropeanRestrictedGreen

15970 | Realization of housing optimization Bezuidenhoutseweg 73 in Den Haag

Rijksvastgoedbedrijf · Restricted · 264070
Type
Works
45000000
Estimated value
€ 7,33M
awarded
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Rijkskantoor Bezuidenhoutseweg 73 in Den Haag, built in 1956, serves as the headquarters for various ministries. Due to an increase in occupancy and a shift in working patterns, there is a need for more inspiring meeting spaces. The project includes the redesign of the Orangerie, the canopy of the restaurant, the meeting pavilion and the kitchen, as well as the former fitness room on level -1. Additionally, a new indoor bicycle storage facility with changing rooms will be realized. The assignment requires an integrated approach to renovation, interior design and facility services, with attention to accessibility, fire safety, building regulations and minimal disruption to daily operations. The execution must comply with the requirements of the Rijksvastgoedbedrijf and the involved ministries, with a focus on sustainability, functionality and an inspiring work culture.

Works · Restricted · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Restricted
Estimated value
€7,325,000
awarded value
Submission deadline
Ongoing
09:30
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPhousing optimizationinteriorbicycle storage

01What is being requested

The Rijkskantoor Bezuidenhoutseweg 73 in Den Haag, built in 1956, serves as the headquarters for various ministries. Due to an increase in occupancy and a shift in working patterns, there is a need for more inspiring meeting spaces. The project includes the redesign of the Orangerie, the canopy of the restaurant, the meeting pavilion and the kitchen, as well as the former fitness room on level -1. Additionally, a new indoor bicycle storage facility with changing rooms will be realized. The assignment requires an integrated approach to renovation, interior design and facility services, with attention to accessibility, fire safety, building regulations and minimal disruption to daily operations. The execution must comply with the requirements of the Rijksvastgoedbedrijf and the involved ministries, with a focus on sustainability, functionality and an inspiring work culture.

The project is located in the Rijkskantoor at the Bezuidenhoutseweg, realized in 1956 according to a design by the then State Architect Gijsbert Friedhoff. The building houses multiple users, of which the Ministerie van Economische Zaken & Klimaat and the Ministerie van Landbouw, Natuur en Voedselkwaliteit are the largest. [newline]Due to a higher occupancy of B73 and a different way of working, there is a need for more meeting and inspiring spaces for consultation and brainstorming. Two areas have been designated to be adapted for this purpose: [newline]- The Orangerie, the canopy of the res

45000000Works

02Outcome

Awarded

Heijmans Utiliteit B.V.

Award value
€7,325,000

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME10031×
2Heijmans Utiliteit B.V.SME10027×
3BAM Bouw en Techniek bvSME9934×
4Heijmans Infra B.V.SME9765×
5KWS Infra B.V.SME9692×
6BINX Smartility B.V.SME9627×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the planned works for the optimization of the housing?
The project includes the redesign of the Orangerie, the canopy of the restaurant, the meeting pavilion and the kitchen, as well as the former fitness room on level -1. Additionally, a new indoor bicycle storage facility with changing rooms will be realized on level -1.
Which specific spaces within the building at Bezuidenhoutseweg 73 are being adapted?
The adaptations focus on building part 10 (Orangerie, restaurant canopy, meeting pavilion), building part 1 (kitchen), building part 2 (former fitness room on -1) and building part 8 (new indoor bicycle storage facility with changing rooms on -1).
What is the objective of the redesign of the Rijkskantoor?
Due to higher occupancy and changed working patterns, there is a need for more meeting spaces and inspiring spaces for consultation and brainstorming.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 8,5 mln

Gegunde waarden in CPV 45 · werken n=3159