AwardedWorksEuropeanRestricted

15835 | Redesign of IND in Ter Apel

Rijksvastgoedbedrijf · Restricted · 290352
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Rijksvastgoedbedrijf has initiated a non-public procedure for the redesign of the IND complex in Ter Apel. The building, along with the COA and DJI, no longer meets modern working and safety standards. Key bottlenecks include outdated interior fit-outs, an unfunctional spatial layout, a lack of contractual control over supply chain partners, and health risks for employees and asylum seekers. The assignment comprises both a complete redesign and a bundling of maintenance works. The focus lies on creating a flexible, safe, and efficient workspace, modernizing technical installations, and establishing clear agreements with suppliers and partners. The tender requires an integrated approach that combines both building and operational aspects, with attention to sustainability and regulatory compliance.

Works · Restricted · European procedure

European
Contracting authority
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
09:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderredesignINDTer Apel

01What is being requested

The Rijksvastgoedbedrijf has initiated a non-public procedure for the redesign of the IND complex in Ter Apel. The building, along with the COA and DJI, no longer meets modern working and safety standards. Key bottlenecks include outdated interior fit-outs, an unfunctional spatial layout, a lack of contractual control over supply chain partners, and health risks for employees and asylum seekers. The assignment comprises both a complete redesign and a bundling of maintenance works. The focus lies on creating a flexible, safe, and efficient workspace, modernizing technical installations, and establishing clear agreements with suppliers and partners. The tender requires an integrated approach that combines both building and operational aspects, with attention to sustainability and regulatory compliance.

The IND complex is located on the site where the COA and DJI are also housed.dennsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnsteinnste

45000000Works

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Bidders in this segment

#Likely bidderFitWins
1Hegeman Bouw & Infra B.V.SME9631×
2Heijmans Utiliteit B.V.SME9527×
3BAM Bouw en Techniek bvSME9334×
4BINX Smartility B.V.SME9227×
5Boskalis Nederland B.V.SME9269×
6Croonwolter&dros B.V.SME9025×

05Legal themes that may be relevant here

06Frequently asked questions

What is the objective of the redesign of the IND complex in Ter Apel?
The assignment aims for a complete redesign and the bundling of a large number of maintenance works. The goal is to create a flexible, safe, and efficient workspace where current bottlenecks, such as an outdated interior fit-out and an insufficiently functional spatial layout, are resolved.
Which specific bottlenecks in the current housing are being addressed?
The redesign focuses on improving the contemporary working environment, correcting the spatial layout, renewing the outdated interior fit-out, and reducing health risks for employees and asylum seekers. Additionally, an attempt is made to gain more contractual control over supply chain partners.
What does the assignment include besides the redesign of the building?
In addition to the redesign, the assignment includes a bundling of a large number of maintenance works that must be carried out on the complex.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159