15-2023 Reitdiepzone - Friesestraatweg Zuid
The Municipality of Groningen intends to make the southern part of the Friesestraatweg, between the Pleiadenbrug and the level crossing, future-proof. The Woldring location has already been developed, and the Crossroads location is in full swing. The project focuses on adjusting the stormwater drainage (sewerage) and redesigning the underground infrastructure, while utility companies use the same location. The works take place on contaminated soil, making function-oriented remediation necessary. In a specific area, archaeological values are threatened, requiring archaeological supervision. The redesign of the public space is not included in this assignment; that will be procured separately at a later stage. The procedure is non-public and concerns a work order without a CPV code. The project requires close coordination between city engineers, utility companies, remediation specialists, and archaeologists.
Works · Restricted · National procedure
01What is being requested
The Municipality of Groningen intends to make the southern part of the Friesestraatweg, between the Pleiadenbrug and the level crossing, future-proof. The Woldring location has already been developed, and the Crossroads location is in full swing. The project focuses on adjusting the stormwater drainage (sewerage) and redesigning the underground infrastructure, while utility companies use the same location. The works take place on contaminated soil, making function-oriented remediation necessary. In a specific area, archaeological values are threatened, requiring archaeological supervision. The redesign of the public space is not included in this assignment; that will be procured separately at a later stage. The procedure is non-public and concerns a work order without a CPV code. The project requires close coordination between city engineers, utility companies, remediation specialists, and archaeologists.
This project concerns the southern part of the Friesestraatweg; between the Pleiadenbrug and the level crossing. Here, the Woldring location has already been developed and the development of the Crossroads location is in full swing. To make the area future-proof, among other things, the sewerage must be adjusted (stormwater drainage) and the public space must be redesigned. Simultaneously, utility companies are working at the same location to adjust the underground infrastructure. This takes place in contaminated soil; therefore, the work is carried out by means of function-oriented remediatio
02Outcome
Avitec Infra & Milieu
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the scope of the works regarding the underground infrastructure?
Which specific remediation method is applied during the works?
Is archaeological supervision required during execution?
Is the redesign of the public space part of this assignment?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159