TU Delft announces a prior notice for the realization of a building with four Romney sheds for an APT facility on the Campus Zuid. Interested parties must indicate this before March 20, 2026.
Works · National procedure
01What is being requested
The realization of a building at the TU Delft Campus Zuid consisting of four high-quality Romney sheds including fit-out package and installations for an Accelerated Pavement Testing (APT) facility.
TU Delft intends to start a tender process for the realization of the Lintrack project at Campus Zuid (Van Amstelpark). Lintrack concerns an Accelerated Pavement Testing (APT) facility for research into traffic loading on full-scale road structures. The assignment includes the realization of four high-quality Romney sheds, including the fit-out package and installations. The building consists of a combination of research space, office space, storage, and dispatch space. The office and dispatch shed will be executed with insulation. The largest shed (office function) will be provided with glass
02Strategic insight
<ul Focus on the engineering/drawing department to add value to the design optimization process. Ensure an organization that can manage the total package, either directly or via subcontractors.
03Points of attention
04Can I take part?
05Process & timeline
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What does the assignment for the realization of the Lintrack facility include?
What expertise is expected from the contractor?
What is the expected schedule for this project?
What are the specific construction characteristics of the sheds?
Automatically compiled from the official tender data and documents.