1-W-21873-23: Construction of Hofbogendakpark - Construction Team Phase
The Municipality of Rotterdam utilizes a three-phase contract for the Hofbogendakpark. In the construction team phase, a construction team agreement (DNR 2011) is drawn up, followed by a realization phase and a maintenance phase (UAV 2012 and AIV-VNG). The works include the removal of 12,500 m² of roofing, repair of 10,000 m² of concrete, installation of a water-resistant layer and a roof park with a crate system, urban water buffer, balustrade replacement, maintenance path, national monument works, steel stairs/lifts, and foundation adjustments. The project takes place at an active, inner-city location. The tender requires an external construction team partner with expertise in sustainable roof parks, water management, and monumental structures, and sound knowledge of the Dutch contractual frameworks.
Works · Open · European procedure
01What is being requested
The Municipality of Rotterdam utilizes a three-phase contract for the Hofbogendakpark. In the construction team phase, a construction team agreement (DNR 2011) is drawn up, followed by a realization phase and a maintenance phase (UAV 2012 and AIV-VNG). The works include the removal of 12,500 m² of roofing, repair of 10,000 m² of concrete, installation of a water-resistant layer and a roof park with a crate system, urban water buffer, balustrade replacement, maintenance path, national monument works, steel stairs/lifts, and foundation adjustments. The project takes place at an active, inner-city location. The tender requires an external construction team partner with expertise in sustainable roof parks, water management, and monumental structures, and sound knowledge of the Dutch contractual frameworks.
The selection of a construction team partner in a two-phase contract for the preparation (and subsequently, potentially in the next contract phase) of the construction of a water system and the application of planting for a park on the roof of the Hofbogen, the installation of access points, and the execution of associated and additional works. It is due to the nature and scope of the works that the Contracting Authority requires external expertise. In this context, three (3) phases have been chosen, including the construction team phase. Each phase constitutes a separate assignment. In the c
02Outcome
Combi Dura Vermeer Infra Regionale Projecten B.V. Van Dijk Maasland
03Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
04Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
05Bidders in this segment
06Legal themes that may be relevant here
07Frequently asked questions
What phases does the contract for the Hofbogendakpark consist of?
What is the purpose of the construction team phase in this tender?
Which contractual conditions apply to the maintenance phase?
What are the most important works carried out in the realization phase?
Automatically compiled from the official tender data and documents.