AwardedWorksEuropeanOpen

1-W-21873-23: Construction of Hofbogendakpark - Construction Team Phase

Gemeente Rotterdam · Open · 316659
Type
Works
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Rotterdam utilizes a three-phase contract for the Hofbogendakpark. In the construction team phase, a construction team agreement (DNR 2011) is drawn up, followed by a realization phase and a maintenance phase (UAV 2012 and AIV-VNG). The works include the removal of 12,500 m² of roofing, repair of 10,000 m² of concrete, installation of a water-resistant layer and a roof park with a crate system, urban water buffer, balustrade replacement, maintenance path, national monument works, steel stairs/lifts, and foundation adjustments. The project takes place at an active, inner-city location. The tender requires an external construction team partner with expertise in sustainable roof parks, water management, and monumental structures, and sound knowledge of the Dutch contractual frameworks.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPVWorksEU tenderbouwteamwatersysteemdakpark

01What is being requested

The Municipality of Rotterdam utilizes a three-phase contract for the Hofbogendakpark. In the construction team phase, a construction team agreement (DNR 2011) is drawn up, followed by a realization phase and a maintenance phase (UAV 2012 and AIV-VNG). The works include the removal of 12,500 m² of roofing, repair of 10,000 m² of concrete, installation of a water-resistant layer and a roof park with a crate system, urban water buffer, balustrade replacement, maintenance path, national monument works, steel stairs/lifts, and foundation adjustments. The project takes place at an active, inner-city location. The tender requires an external construction team partner with expertise in sustainable roof parks, water management, and monumental structures, and sound knowledge of the Dutch contractual frameworks.

The selection of a construction team partner in a two-phase contract for the preparation (and subsequently, potentially in the next contract phase) of the construction of a water system and the application of planting for a park on the roof of the Hofbogen, the installation of access points, and the execution of associated and additional works. It is due to the nature and scope of the works that the Contracting Authority requires external expertise. In this context, three (3) phases have been chosen, including the construction team phase. Each phase constitutes a separate assignment. In the c

Works

02Outcome

Awarded

Combi Dura Vermeer Infra Regionale Projecten B.V. Van Dijk Maasland

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Bidders in this segment

#Likely bidderFitWins
1Dura Vermeer Infra Regionale Projecten BV potentialSME40
2BAM Infra B.V. potentialSME37
3GKB Realisatie B.V. potentialSME36
4De Vries Verburg Bouw B.V. potentialSME35
5Combinatie Van den Herik - De Vries V.O.F. potentialUnknown35
6Boskalis Nederland B.V. potentialSME34

06Legal themes that may be relevant here

07Frequently asked questions

What phases does the contract for the Hofbogendakpark consist of?
The project is divided into three phases: the construction team phase (with a construction team agreement based on DNR 2011), the realization phase (with an execution agreement based on UAV 2012), and the maintenance phase (based on the AIV-VNG).
What is the purpose of the construction team phase in this tender?
In the construction team phase, the assignment is elaborated together with the market before proceeding to the realization phase.
Which contractual conditions apply to the maintenance phase?
For the multi-year maintenance in the maintenance phase of the constructed Hofbogendakpark, an agreement is concluded based on the General Purchasing Conditions of the Association of Netherlands Municipalities (the model AIV-VNG).
What are the most important works carried out in the realization phase?
The works include, among other things, the removal of approx. 12,500 m2 of roofing, repair of approx. 10,000 m2 of concrete, construction of a new water system with a crate system, replacement of 3,500m of balustrade, and works on a national monument.

Automatically compiled from the official tender data and documents.