ClosedWorksEuropeanOpenGreen

1-W-17819-24 Management works distribution centres Teugeweg and Keileweg

Gemeente Rotterdam · Open · 1 lots · 349976
Type
Works
45000000
Estimated value
€ 6,00M
estimated
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Rotterdam is issuing an open tender for the management works of two distribution centres (Teugeweg and Keileweg). The work includes the transport of approximately 1,000 tonnes of rubble, 750 tonnes of residual fractions, and 4,500 tonnes of light to moderately contaminated soil per year. Additionally, there are fixed hours for hydraulic excavators (2,100 hours), trucks (600–850 hours), tractors with attachments (300–700 hours), wheel loaders (1,900–2,100 hours), mobile screening equipment (400–1,500 hours), and star rotor screens (500–800 hours). Use will also be made of containers ranging from one to five cubic meters for the storage of rubble, iron, and asbestos, as well as various small equipment. The exact technical specifications are laid down in the RAW framework agreement. The contract is aimed at a broad group of contractors and offers opportunities for small and medium-sized enterprises to bid.

Works · Open · European procedure

Sustainability countsEuropean
Contracting authority
Contract type
Works
Open
Estimated value
€6,000,000
estimated value
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tenderGreen / SPPdistribution centrerubble transportexcavators

01What is being requested

The Municipality of Rotterdam is issuing an open tender for the management works of two distribution centres (Teugeweg and Keileweg). The work includes the transport of approximately 1,000 tonnes of rubble, 750 tonnes of residual fractions, and 4,500 tonnes of light to moderately contaminated soil per year. Additionally, there are fixed hours for hydraulic excavators (2,100 hours), trucks (600–850 hours), tractors with attachments (300–700 hours), wheel loaders (1,900–2,100 hours), mobile screening equipment (400–1,500 hours), and star rotor screens (500–800 hours). Use will also be made of containers ranging from one to five cubic meters for the storage of rubble, iron, and asbestos, as well as various small equipment. The exact technical specifications are laid down in the RAW framework agreement. The contract is aimed at a broad group of contractors and offers opportunities for small and medium-sized enterprises to bid.

Nature and scope of the Contract. The work of lot 1 mainly consists of: a. the transport of rubble, approximately 1,000 tonnes per year; b. the transport of residual fractions to various destinations, approximately 750 tonnes per year; a. the transport of (light to moderately contaminated) soil to various destinations, approximately 4,500 tonnes per year; c. the deployment of various hydraulic excavators, approximately 2,100 hours per year; d. the deployment of trucks, approximately 600 hours per year; e. the deployment of tractors with attachments, 300 hours per year; f. the deployment of a

45000000€ 6,00MWorks
11-W-17819-24 Management works distribution centres Teugeweg and Keileweg€6,000,000

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€6,000,000

04Likely competitors

#Likely bidderFitWins
1Heijmans Infra B.V.SME9565×
2Dura Vermeer Infra Regionale Projecten BVSME9558×
3Boskalis Nederland B.V.SME9569×
4KWS Infra B.V.SME9492×
5Heijmans Utiliteit B.V.SME9427×
6GKB Realisatie B.V.SME9421×

05Legal themes that may be relevant here

06Frequently asked questions

What does the contract for the transport of materials entail?
The works include the annual transport of approximately 1,000 tonnes of rubble, 750 tonnes of residual fractions and 4,500 tonnes of light to moderately contaminated soil to various destinations.
How many machine hours are deployed per year for the management works?
The deployment includes, among other things, approximately 2,100 hours for hydraulic excavators, 600 to 850 hours for trucks, 300 to 700 hours for tractors with attachments and approximately 1,900 to 2,100 hours for wheel loaders.
Which specific screening plants are part of the contract?
The contract provides for the deployment of mobile crawler screening plants (approximately 400 to 1,500 hours per year) and star rotor screens (approximately 500 to 800 hours per year).
What facilities are required for the storage of materials?
Containers of one to five cubic meters must be used for the storage of rubble, iron and asbestos, supplemented by various small equipment and tools.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 6,0 mln

Gegunde waarden in CPV 45 · werken n=3159